United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in ERCOT (Texas) (2023 requests) — page 6
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Momentum Hazy Jane BESS Battery storage · MOMENTUM HAZY JANE, LLC |
126 MW | In study |
| DMF Sagerton Solar SLF Solar + storage · Double Mountain Fork LLC |
126 MW | In study |
| Momentum Stout BESS Battery storage · Momentum STOUT, LLC |
126 MW | In study |
| Project Lynx BESS Battery storage · Corpus Battery Storage, LLC |
125 MW | Agreement signed |
| Sleepy Hollow BESS Battery storage · Sleepy Hollow BESS, LLC |
123 MW | In study |
| Bronc Rodeo Solar Project Solar · Energiekontor US Texas SP 16 LLC |
122 MW | In study |
| Marengo BESS Battery storage · BRP BLUE TOPAZ 8, LLC |
121 MW | In study |
| Butcherbird Solar Solar · Butcherbird Solar, LLC |
116 MW | In study |
| Pioneer Hutt Solar (Alternative POI) Solar · NextEra Energy Interconnection Holdings LLC |
116 MW | In study |
| Megacharge BESS Battery storage · SMT Harlingen III LLC |
110 MW | In study |
| Solheim Solar Solar · Solheim Solar, LLC |
109 MW | In study |
| Vault Solar Solar · PPM THR Solar |
109 MW | In study |
| Santa Monica Solar Solar · Karol Solar IV |
106 MW | In study |
| Waterloo BESS 1 Solar + storage · Waterloo Solar, LLC |
106 MW | Agreement signed |
| Happy Dog Storage Solar + storage · Rosula Solar LLC |
105 MW | Agreement signed |
| Stargazer BESS Solar + storage · Stargazer Solar LLC |
105 MW | In study |
| Neutron Storage Battery storage · Elawan Neutron Storage, LLC |
105 MW | Agreement signed |
| Cadet Storage Battery storage · TX BESS 5, LLC |
104 MW | In study |
| Evans Creek Energy Storage Battery storage · Evans Creek Energy Storage LLC |
103 MW | In study |
| Black Bear Solar Solar + storage · ESCONDIDO DRAW RESOURCES, LLC |
103 MW | In study |
| Firebird BESS Battery storage · TX BESS 6, LLC |
103 MW | In study |
| Millennium Energy Storage Battery storage |
103 MW | Paused / redesign |
| Roost Energy Storage Battery storage · Bluff Creek Energy Storage LLC |
102 MW | In study |
| Big Five Storage Battery storage · TX BESS 3 LLC |
102 MW | In study |
| Stoneridge BESS Battery storage · Stoneridge Solar, LLC |
102 MW | Agreement signed |
| Myers Solar Solar + storage · BT Myers Solar, LLC |
102 MW | In study |
| Pinnacle Point Energy Storage Battery storage · GCI Pinnacle Point, LLC |
101 MW | In study |
| Blue Creek Energy Storage Battery storage · Blue Creek Energy Storage, LLC |
101 MW | In study |
| Kinney County Energy Battery storage · Kinney County Energy, LLC |
101 MW | In study |
| Lyford Energy Battery storage · Lyford Energy, LLC |
101 MW | In study |
| Southside Energy Battery storage · Southside Energy, LLC |
101 MW | In study |
| Hadrian Energy Storage Battery storage · Hadrian Energy Storage, LLC |
101 MW | In study |
| Hynes Bay Energy Storage Battery storage · Hynes Bay Energy Storage, LLC |
101 MW | In study |
| Solar Star Frontier BESS Battery storage · Solar Star Frontier BESS, LLC |
101 MW | In study |
| Long Point Solar II Solar |
101 MW | Paused / redesign |
| Hide Town Energy Storage Battery storage · Hide Town Energy Storage LLC |
101 MW | In study |
| Lupinus Solar 3 Solar + storage · Lupinus Solar 2, LLC |
101 MW | Agreement signed |
| Rutile BESS Battery storage · Rutile BESS, LLC |
101 MW | Agreement signed |
| Echols Creek Storage Other · BT Ferguson Solar, LLC |
101 MW | Paused / redesign |
| Lemma Solar Solar · Greening USA Corp. |
101 MW | In study |
| Felix Storage Solar + storage · Felix 1, LLC |
101 MW | In study |
| Timber Cove Solar SLF Solar + storage · Freestone Solar, LLC |
101 MW | In study |
| Mud Cat Solar SLF Solar + storage · Mud Cat Solar, LLC |
101 MW | In study |
| Timberline Storage Solar + storage · Timberline Renewables, LLC |
101 MW | In study |
| Wizard Ranch Solar Solar |
101 MW | Paused / redesign |
| Lazy Frog Solar SLF Solar + storage · Lazy Frog Solar, LLC |
100 MW | In study |
| Goldfinch Storage Solar + storage · BT DJ4M Solar, LLC |
100 MW | In study |
| Firebird Solar Solar |
100 MW | Paused / redesign |
| Pledgor BESS Battery storage · Pledgor BESS |
100 MW | In study |
| Rogers Creek BESS Battery storage · Dialville BESS |
100 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)309 · 110.9 GW
- ERCOT (Texas)356 · 76.0 GW
- CAISO (California)107 · 53.4 GW
- Southeast (non-ISO utilities)210 · 24.0 GW
- SPP (Southwest Power Pool)82 · 15.1 GW
- PJM (Mid-Atlantic, Midwest)156 · 14.6 GW
- MISO (Midcontinent)23 · 3,679 MW
- ISO-NE (New England)6 · 1,053 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)