🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Texas

OCTARY USA · INTERCONNECTION QUEUES

Interconnection queue in Texas (2022 requests) — page 5

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown29358.6 GW
Active in queue58.6 GW293 requests
Agreement signed23.9 GW116 requests
Withdrawn8117.0 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

293 requests · page 5 of 6
ProjectCapacityStatusLocationRegionQueuedOnline
Solar Star North Herty Storage
Battery storage · Solar Star North Herty Storage, LLC
126 MWIn study Angelina, TXERCOT Feb 2022target 2027
Becerra Creek Storage 1
Battery storage · Bordas Renewable Energy, LLC
126 MWIn study Webb, TXERCOT Sep 2022target 2027
Becerra Creek Storage 2
Battery storage · Bordas Renewable Energy, LLC
126 MWIn study Webb, TXERCOT Sep 2022target 2027
Star Dairy Solar
Solar + storage · Star Dairy Solar LLC
126 MWAgreement signed Lamar, TXERCOT Nov 2022target 2027
Backbone Creek BESS
Battery storage · Backbone Creek BESS LLC
124 MWAgreement signed Burnet, TXERCOT Apr 2022target 2026
East West BESS
Battery storage · East West Energy Storage, LLC
123 MWAgreement signed Kerr, TXERCOT Oct 2022target 2027
Nymphaea Solar
Solar + storage · Nymphaea Solar, LLC
121 MWIn study Wichita, TXERCOT Sep 2022target 2028
Sun Cactus Solar
Solar · Sun Cactus Solar Project, LLC
121 MWAgreement signed Duval, TXERCOT Jul 2022target 2027
Fairway Storage
Battery storage · Fairway Storage LLC
120 MWAgreement signed Freestone, TXERCOT Nov 2022target 2027
Riverwalk BESS
Battery storage · RWE Solar Developement, LLC
120 MWIn study Bexar, TXERCOT Jul 2022target 2027
Big Elm Storage
Solar + storage · Big Elm Storage, LLC
120 MWAgreement signed Bell, TXERCOT Apr 2022target 2027
Pioneer Hutt Solar
Solar
116 MWPaused / redesign Midland, TXERCOT Oct 2022
Hayrick BESS
Battery storage · Gransolar Texas Five LLC
114 MWIn study Coke, TXERCOT Aug 2022target 2028
Three W Solar
Solar · Three W Solar LLC
111 MWAgreement signed Hill, TXERCOT Mar 2022target 2026
Ophelia Solar
Solar · Ophelia Solar
111 MWIn study Ector, TXERCOT Sep 2022target 2028
Inertia BESS 3
Battery storage
108 MWPaused / redesign Jones, TXERCOT Aug 2022
Longfellow BESS II
Solar + storage · CENTURY GAS PROCESSING, LLC
106 MWAgreement signed Pecos, TXERCOT Nov 2022target 2026
Burgos Solar
Solar · Twin Oaks Solar, LLC
106 MWIn study Milam, TXERCOT Oct 2022target 2027
Reis Solar
Solar · Greenalia Solar Power Reis LLC
106 MWIn study Atascosa, TXERCOT Jun 2022target 2027
Piedra BESS
Solar + storage · Piedra Solar, LLC
104 MWAgreement signed Freestone, TXERCOT Sep 2022target 2026
Bronze Quinta Storage
Battery storage · KCE TX 28, LLC
104 MWIn study Hidalgo, TXERCOT Jan 2022target 2028
Appaloosa Run BESS
Battery storage · APPALOOSA RUN STORAGE, LLC
103 MWIn study Upton, TXERCOT Mar 2022target 2026
Amador Storage
Battery storage · BT Amador Storage, LLC
102 MWAgreement signed Van Zandt, TXERCOT Nov 2022target 2026
Remy Jade III Power Station
Gas · Remy Jade III Generating, LLC
102 MWAgreement signed Harris, TXERCOT Jul 2022target 2028
Half Moon 2 BESS
Battery storage
102 MWPaused / redesign Hidalgo, TXERCOT Mar 2022
Kennedy Solar
Solar + storage · Kennedy Bypass Solar LLC
102 MWIn study Navarro, TXERCOT Mar 2022target 2028
Triangle Ranch Delta
Onshore wind
102 MWPaused / redesign Cottle, TXERCOT Sep 2022target 2025
Rose Quartz BESS
Battery storage · Rose Quartz BESS, LLC
101 MWIn study Dimmit, TXERCOT Sep 2022target 2026
Raven Storage
Battery storage · Raven Storage, LLC
101 MWAgreement signed Wharton, TXERCOT Jan 2022target 2026
Blanket Ranch South Solar
Solar + storage · Blanket Ranch South Solar, LLC
101 MWIn study Brown, TXERCOT Jun 2022target 2028
Citrus Flatts BESS
Battery storage · Citrus Flatts Energy Center, LLC
101 MWAgreement signed Cameron, TXERCOT Mar 2022target 2026
Saltillo Storage
Battery storage
101 MWPaused / redesign Bastrop, TXERCOT May 2022target 2025
Luthor Solar
Solar · TREX US Luthor LLC
101 MWIn study Howard, TXERCOT Jun 2022target 2027
Glory Bee Storage
Solar + storage · Riley Solar LLC
101 MWIn study Erath, TXERCOT Jun 2022target 2026
Glasgow Storage
Solar + storage · Glasgow Solar LLC
101 MWAgreement signed Navarro, TXERCOT Feb 2022target 2027
Carambola BESS
Battery storage · SMT McAllen II LLC
101 MWAgreement signed Hidalgo, TXERCOT Oct 2022target 2026
Pinewood BESS
Battery storage
101 MWPaused / redesign Brazoria, TXERCOT Sep 2022
Venus Mill Storage
Battery storage
101 MWPaused / redesign Ellis, TXERCOT Mar 2022target 2026
Padrino BESS
Battery storage
101 MWPaused / redesign Hill, TXERCOT Sep 2022
Picadillo BESS
Battery storage · Black Mountain Energy Storage II
101 MWAgreement signed Martin, TXERCOT Mar 2022target 2028
Hana Springs BESS
Battery storage · Black Mountain Energy Storage II LLC
101 MWIn study Lampasas, TXERCOT Nov 2022target 2028
Dolce BESS
Battery storage · Dolce BESS, LLC
101 MWIn study Mitchell, TXERCOT Sep 2022target 2028
Huisache BESS
Solar + storage · Huisache Solar, LLC
101 MWAgreement signed Wilson, TXERCOT Aug 2022target 2029
Sagewood BESS
Battery storage · Sagewood BESS, LLC
101 MWIn study Glasscock, TXERCOT Sep 2022target 2028
Triangle Ranch Echo
Onshore wind
101 MWPaused / redesign Cottle, TXERCOT Sep 2022target 2025
Triangle Ranch Fox
Onshore wind
101 MWPaused / redesign Cottle, TXERCOT Sep 2022target 2025
AP Greenport
Battery storage · AP Greenport
101 MWIn study Travis, TXERCOT Jun 2022target 2027
Guinness BESS
Battery storage · Momentum Energy Storage Partners,LLC
101 MWIn study Williamson, TXERCOT Jul 2022target 2027
Hermes Storage
Solar + storage · Bell 1 Storage LLC
100 MWAgreement signed Bell, TXERCOT Jul 2022target 2026
Ariji BESS
Battery storage · Ariji BESS, LLC
100 MWAgreement signed Howard, TXERCOT Sep 2022target 2027

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)