| Project | Capacity | Status |
|---|---|---|
| Solar Star North Herty Storage Battery storage · Solar Star North Herty Storage, LLC |
126 MW | In study |
| Becerra Creek Storage 1 Battery storage · Bordas Renewable Energy, LLC |
126 MW | In study |
| Becerra Creek Storage 2 Battery storage · Bordas Renewable Energy, LLC |
126 MW | In study |
| Star Dairy Solar Solar + storage · Star Dairy Solar LLC |
126 MW | Agreement signed |
| Backbone Creek BESS Battery storage · Backbone Creek BESS LLC |
124 MW | Agreement signed |
| East West BESS Battery storage · East West Energy Storage, LLC |
123 MW | Agreement signed |
| Nymphaea Solar Solar + storage · Nymphaea Solar, LLC |
121 MW | In study |
| Sun Cactus Solar Solar · Sun Cactus Solar Project, LLC |
121 MW | Agreement signed |
| Fairway Storage Battery storage · Fairway Storage LLC |
120 MW | Agreement signed |
| Riverwalk BESS Battery storage · RWE Solar Developement, LLC |
120 MW | In study |
| Big Elm Storage Solar + storage · Big Elm Storage, LLC |
120 MW | Agreement signed |
| Pioneer Hutt Solar Solar |
116 MW | Paused / redesign |
| Hayrick BESS Battery storage · Gransolar Texas Five LLC |
114 MW | In study |
| Three W Solar Solar · Three W Solar LLC |
111 MW | Agreement signed |
| Ophelia Solar Solar · Ophelia Solar |
111 MW | In study |
| Inertia BESS 3 Battery storage |
108 MW | Paused / redesign |
| Longfellow BESS II Solar + storage · CENTURY GAS PROCESSING, LLC |
106 MW | Agreement signed |
| Burgos Solar Solar · Twin Oaks Solar, LLC |
106 MW | In study |
| Reis Solar Solar · Greenalia Solar Power Reis LLC |
106 MW | In study |
| Piedra BESS Solar + storage · Piedra Solar, LLC |
104 MW | Agreement signed |
| Bronze Quinta Storage Battery storage · KCE TX 28, LLC |
104 MW | In study |
| Appaloosa Run BESS Battery storage · APPALOOSA RUN STORAGE, LLC |
103 MW | In study |
| Amador Storage Battery storage · BT Amador Storage, LLC |
102 MW | Agreement signed |
| Remy Jade III Power Station Gas · Remy Jade III Generating, LLC |
102 MW | Agreement signed |
| Half Moon 2 BESS Battery storage |
102 MW | Paused / redesign |
| Kennedy Solar Solar + storage · Kennedy Bypass Solar LLC |
102 MW | In study |
| Triangle Ranch Delta Onshore wind |
102 MW | Paused / redesign |
| Rose Quartz BESS Battery storage · Rose Quartz BESS, LLC |
101 MW | In study |
| Raven Storage Battery storage · Raven Storage, LLC |
101 MW | Agreement signed |
| Blanket Ranch South Solar Solar + storage · Blanket Ranch South Solar, LLC |
101 MW | In study |
| Citrus Flatts BESS Battery storage · Citrus Flatts Energy Center, LLC |
101 MW | Agreement signed |
| Saltillo Storage Battery storage |
101 MW | Paused / redesign |
| Luthor Solar Solar · TREX US Luthor LLC |
101 MW | In study |
| Glory Bee Storage Solar + storage · Riley Solar LLC |
101 MW | In study |
| Glasgow Storage Solar + storage · Glasgow Solar LLC |
101 MW | Agreement signed |
| Carambola BESS Battery storage · SMT McAllen II LLC |
101 MW | Agreement signed |
| Pinewood BESS Battery storage |
101 MW | Paused / redesign |
| Venus Mill Storage Battery storage |
101 MW | Paused / redesign |
| Padrino BESS Battery storage |
101 MW | Paused / redesign |
| Picadillo BESS Battery storage · Black Mountain Energy Storage II |
101 MW | Agreement signed |
| Hana Springs BESS Battery storage · Black Mountain Energy Storage II LLC |
101 MW | In study |
| Dolce BESS Battery storage · Dolce BESS, LLC |
101 MW | In study |
| Huisache BESS Solar + storage · Huisache Solar, LLC |
101 MW | Agreement signed |
| Sagewood BESS Battery storage · Sagewood BESS, LLC |
101 MW | In study |
| Triangle Ranch Echo Onshore wind |
101 MW | Paused / redesign |
| Triangle Ranch Fox Onshore wind |
101 MW | Paused / redesign |
| AP Greenport Battery storage · AP Greenport |
101 MW | In study |
| Guinness BESS Battery storage · Momentum Energy Storage Partners,LLC |
101 MW | In study |
| Hermes Storage Solar + storage · Bell 1 Storage LLC |
100 MW | Agreement signed |
| Ariji BESS Battery storage · Ariji BESS, LLC |
100 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)283 · 56.6 GW
- MISO (Midcontinent)6 · 1,095 MW
- SPP (Southwest Power Pool)2 · 693 MW
- West (non-ISO utilities)2 · 150 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)