United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Ophelia Solar

Ophelia Solar is a 111 MW solar request in interconnection study in the ERCOT interconnection queue, in Ector County, Texas.

Queue statusIn planning
  1. PlanningQueued Sep 2022 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Sep 2028 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
23INR0471
Grid region
ERCOT (Texas)
Developer
Ophelia Solar
Connection point (POI)
Tap 138 kV Raceway Switch #18663 - Shin Oak POD #11128
Location
Ector County, Texas
Technology
Solar: 111 MW
Total requested
111 MW
Study phase
SS Completed, FIS Started, No IA
Queue status
Active
Entered queue
2 September 2022
Proposed online date
September 2028

Location

Marker shows the centre of Ector County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Ector County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem