OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in California — page 5
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Mojave Solar Park 4 - Johnson Valley Solar |
612 MW | Withdrawn / abandoned |
| Marsh Landing Generating Station - Combined Cycle Units Gas |
611 MW | Withdrawn / abandoned |
| Pittsburg Power Plant - Ccu Gas |
611 MW | Withdrawn / abandoned |
| Venado Valley 1 Solar + storage |
610 MW | Withdrawn / abandoned |
| Vernon Power Plant Gas |
610 MW | Withdrawn / abandoned |
| Canella Solar Farm Solar + storage |
610 MW | Withdrawn / abandoned |
| Blue Oak Storage 2 Battery storage |
609 MW | Withdrawn / abandoned |
| Red Arch Hybrid Solar Solar + storage |
608 MW | Withdrawn / abandoned |
| Europa Energy Center Solar + storage |
607 MW | Withdrawn / abandoned |
| Panache Solar Solar + storage |
606 MW | Withdrawn / abandoned |
| Great Dane Solar Solar + storage |
601 MW | Withdrawn / abandoned |
| Solar project 2018-G1 Solar |
600 MW | Withdrawn / abandoned |
| Solar project 2017-G1 Solar |
600 MW | Withdrawn / abandoned |
| La Paloma II Gas |
600 MW | Withdrawn / abandoned |
| Cadiz East Solar |
600 MW | Withdrawn / abandoned |
| Sutter Energy Center Gas |
600 MW | Withdrawn / abandoned |
| Sutter Energy Center 2 Gas |
600 MW | Withdrawn / abandoned |
| East Altamont Energy Center Gas |
600 MW | Withdrawn / abandoned |
| Meteorite Solar Solar + storage |
600 MW | Withdrawn / abandoned |
| Ogilby Solar |
600 MW | Withdrawn / abandoned |
| Imperial Valley Generation Project Gas |
600 MW | Withdrawn / abandoned |
| Valley Oak Solar Solar |
600 MW | Withdrawn / abandoned |
| Irish Gas |
600 MW | Withdrawn / abandoned |
| Scorpio Storage Battery storage |
600 MW | Withdrawn / abandoned |
| KRCD Community Power Plant Gas |
600 MW | Withdrawn / abandoned |
| Avenal Energy Project Gas |
600 MW | Withdrawn / abandoned |
| Maricopa Solar Solar |
600 MW | Withdrawn / abandoned |
| Golden Bear Solar + storage |
594 MW | Withdrawn / abandoned |
| Bridgeview Energy Facility Gas |
590 MW | Withdrawn / abandoned |
| La Luz Energy Center Solar + storage |
588 MW | Withdrawn / abandoned |
| Lycka Solar Solar + storage |
587 MW | Withdrawn / abandoned |
| Castle Wind Offshore Offshore wind |
576 MW | Withdrawn / abandoned |
| Fairfield Energy Center Gas |
575 MW | Withdrawn / abandoned |
| Palmdale Power Plant Gas |
570 MW | Withdrawn / abandoned |
| Victorville 2 Gas |
570 MW | Withdrawn / abandoned |
| Spectrum Energy Storage 2 Battery storage |
566 MW | Withdrawn / abandoned |
| Campito Peak Battery storage |
566 MW | Withdrawn / abandoned |
| Mojave Solar Park 2 Solar |
565 MW | Withdrawn / abandoned |
| CPV California I Gas |
564 MW | Withdrawn / abandoned |
| Long Beach 5, 6, 7 & 8 Gas |
557 MW | Withdrawn / abandoned |
| Fuerte Energy Storage Battery storage |
554 MW | Withdrawn / abandoned |
| Monte Cristo Solar 1 Solar |
553 MW | Withdrawn / abandoned |
| Monte Cristo Solar 2 Solar |
553 MW | Withdrawn / abandoned |
| Ses Solar Three Solar |
550 MW | Withdrawn / abandoned |
| Golden Hills Power Gas |
550 MW | Withdrawn / abandoned |
| Jasper Segs (Fka Sonoran West II) Solar |
540 MW | Withdrawn / abandoned |
| Central Valley II Segs Solar |
540 MW | Withdrawn / abandoned |
| Kairos Hybrid Solar + storage |
539 MW | Withdrawn / abandoned |
| Nci Hybrid Power Solar + storage |
538 MW | Withdrawn / abandoned |
| Chuckwalla Solar + storage |
535 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)