United States › Grid › Interconnection queues › California

GAS · CAISO

East Altamont Energy Center

East Altamont Energy Center is a 600 MW gas request withdrawn in the CAISO interconnection queue, in Alameda County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2008 (completed)
  2. Withdrawn / abandonedNov 2008 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
377
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Tracy Substation 230 kV
Location
Alameda County, California
Technology
Gas: 600 MW
Total requested
600 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
28 May 2008
Proposed online date
May 2013
Withdrawn
November 2008

Location

Marker shows the centre of Alameda County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Alameda County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem