United States βΊ Grid βΊ Interconnection queues βΊ California
SOLAR Β· WESTSolar project 2017-G1
Solar project 2017-G1 is a 600 MW solar request withdrawn in the West interconnection queue, connecting to WAPA Sierra Nevada.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2017 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 2017-G1
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- WAPA Sierra Nevada
- Connection point (POI)
- Tracy 230 kV Substation
- Location
- California
- Technology
- Solar: 600 MW
- Total requested
- 600 MW
- Study phase
- Withdrawn by Customer. Customer to proceed with Dos Amigos POI under 2018-G1 Project.
- Queue status
- Withdrawn
- Entered queue
- 30 January 2017
- Proposed online date
- April 2024
Location
No county location in the queue data.
Power plants in California Β· Transmission lines in California
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem