SOLAR Β· WEST

Solar project 2017-G1

Solar project 2017-G1 is a 600 MW solar request withdrawn in the West interconnection queue, connecting to WAPA Sierra Nevada.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2017 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
2017-G1
Grid region
West (non-ISO utilities)
Utility / transmission owner
WAPA Sierra Nevada
Connection point (POI)
Tracy 230 kV Substation
Location
California
Technology
Solar: 600 MW
Total requested
600 MW
Study phase
Withdrawn by Customer. Customer to proceed with Dos Amigos POI under 2018-G1 Project.
Queue status
Withdrawn
Entered queue
30 January 2017
Proposed online date
April 2024

Location

No county location in the queue data.

Power plants in California Β· Transmission lines in California

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem