United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in CAISO (California) — page 37
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Tumbleweed Solar Generating Station Solar |
33.0 MW | Withdrawn / abandoned |
| Golden Oasis Solar |
33.0 MW | Withdrawn / abandoned |
| Phoenix Solar Generating Station Solar |
33.0 MW | Withdrawn / abandoned |
| Gaucho Storage Battery storage |
32.4 MW | Withdrawn / abandoned |
| Amaretti Solar Solar + storage |
32.0 MW | Withdrawn / abandoned |
| Western Geopower Unit 1 Geothermal |
32.0 MW | Withdrawn / abandoned |
| Coriander Solar + storage |
32.0 MW | Withdrawn / abandoned |
| Iceberg Energy Storage Battery storage |
31.8 MW | Withdrawn / abandoned |
| West Ford Flat Energy Storage 2 Battery storage |
31.0 MW | Withdrawn / abandoned |
| LYNX Solar Solar |
30.9 MW | Withdrawn / abandoned |
| Hanson Energy Center Battery storage |
30.8 MW | Withdrawn / abandoned |
| Tatton Storage 1 Battery storage |
30.6 MW | Withdrawn / abandoned |
| Apricot Energy Storage Battery storage |
30.6 MW | Withdrawn / abandoned |
| Loriner Storage Battery storage |
30.5 MW | Withdrawn / abandoned |
| Crowswest Solar + storage |
30.2 MW | Withdrawn / abandoned |
| Victor Grid Stabilization Project Battery storage |
30.0 MW | Withdrawn / abandoned |
| Big Horn 30MW PV Project Solar |
30.0 MW | Withdrawn / abandoned |
| Fox Solar Solar |
30.0 MW | Withdrawn / abandoned |
| Painted Hills II Onshore wind |
30.0 MW | Withdrawn / abandoned |
| Cuckoo Energy Storage Battery storage |
30.0 MW | Withdrawn / abandoned |
| Miguel BESS (Fka Miguel) Battery storage |
30.0 MW | Withdrawn / abandoned |
| PV-1 Solar |
30.0 MW | Withdrawn / abandoned |
| Colinas De Oro Battery storage |
30.0 MW | Withdrawn / abandoned |
| Calrenew-1 Solar |
30.0 MW | Withdrawn / abandoned |
| Sungen 1 Solar |
30.0 MW | Withdrawn / abandoned |
| Collinsville Wind Onshore wind |
30.0 MW | Withdrawn / abandoned |
| Frontier Solar II (Fka Scatec Westside Solar Ranch II) Solar |
30.0 MW | Withdrawn / abandoned |
| Zamora Solar Solar |
30.0 MW | Withdrawn / abandoned |
| Tesla Wind Bank Battery storage |
30.0 MW | Withdrawn / abandoned |
| Madera Power Other |
29.0 MW | Withdrawn / abandoned |
| Medeiros Solar Solar |
28.4 MW | Withdrawn / abandoned |
| Egp Solar 1 Solar |
28.0 MW | Withdrawn / abandoned |
| Harbor Cogeneration Gas |
28.0 MW | Withdrawn / abandoned |
| Diablo Canyon P.P. #1 Unit Nuclear |
28.0 MW | Withdrawn / abandoned |
| Freeborn Solar |
27.3 MW | Withdrawn / abandoned |
| Contra Costa Carbon Plant Reconnect (CCCPR) Other |
27.2 MW | Withdrawn / abandoned |
| Deadhorse Wells Geothermal Project Geothermal |
27.0 MW | Withdrawn / abandoned |
| GWF Hanford Combined Cycle Power Plant Gas |
27.0 MW | Withdrawn / abandoned |
| Bme Otay Mesa Biomass Facility Other |
27.0 MW | Withdrawn / abandoned |
| Marine Depot Battery storage |
26.6 MW | Withdrawn / abandoned |
| Otay Mesa Energy Center Expansion Gas |
26.4 MW | Withdrawn / abandoned |
| Chula Vista BESS Expansion Battery storage |
26.0 MW | Withdrawn / abandoned |
| Stowe Energy Storage (Fka Poway) Battery storage |
25.0 MW | Withdrawn / abandoned |
| Challenger Solar |
25.0 MW | Withdrawn / abandoned |
| Palen DRY Lake PV Solar |
25.0 MW | Withdrawn / abandoned |
| Woodland Battery Project Battery storage |
25.0 MW | Withdrawn / abandoned |
| Utica 25MW PV Project Solar |
25.0 MW | Withdrawn / abandoned |
| Henrietta Energy Storage Battery storage |
25.0 MW | Withdrawn / abandoned |
| Maria Pico Energy Storage Center Battery storage |
25.0 MW | Withdrawn / abandoned |
| Favorito Solar |
25.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)