🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › California

OTHER · CAISO

Contra Costa Carbon Plant Reconnect (CCCPR)

Contra Costa Carbon Plant Reconnect (CCCPR) is a 27.2 MW other request withdrawn in the CAISO interconnection queue, in Contra Costa County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2006 (completed)
  2. Withdrawn / abandonedJul 2007 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
127
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
115kV Oleum Switchyard
Location
Contra Costa County, California
Technology
Other: 27.2 MW
Total requested
27.2 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
1 September 2006
Proposed online date
August 2008
Withdrawn
July 2007

Location

Marker shows the centre of Contra Costa County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Contra Costa County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem