Frontier Solar II (Fka Scatec Westside Solar Ranch II)

Frontier Solar II (Fka Scatec Westside Solar Ranch II) is a 30.0 MW solar request withdrawn in the CAISO interconnection queue, in Stanislaus County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2011 (completed)
  2. Withdrawn / abandonedApr 2013 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
765
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Salado - Newman 60 KV
Location
Stanislaus County, California
Technology
Solar: 30.0 MW
Total requested
30.0 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
31 March 2011
Proposed online date
October 2013
Withdrawn
April 2013

Location

Marker shows the centre of Stanislaus County; the queue data does not give exact sites.