United States › Grid › Interconnection queues › California
BATTERY STORAGE · CAISOTatton Storage 1
Tatton Storage 1 is a 30.6 MW battery storage request withdrawn in the CAISO interconnection queue, in Mendocino County, California, connecting to PGAE.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2019 (completed)
- Withdrawn / abandonedFeb 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1546
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- Elk-Gualala 60 kV
- Location
- Mendocino County, California
- Technology
- Battery: 30.6 MW
- Total requested
- 30.6 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 15 April 2019
- Proposed online date
- December 2021
- Withdrawn
- February 2020
Location
Marker shows the centre of Mendocino County; the queue data does not give exact sites.
Power plants in California · Transmission lines in California
Other requests in Mendocino County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem