United States › Grid › Interconnection queues › California
HYDRO · CAISOMendocino Waveconnect Project
Mendocino Waveconnect Project is a 40.0 MW hydro request withdrawn in the CAISO interconnection queue, in Mendocino County, California, connecting to PGAE.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2007 (completed)
- Withdrawn / abandonedNov 2008 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 280
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- Fort Bragg Substation 60kV bus
- Location
- Mendocino County, California
- Technology
- Hydro: 40.0 MW
- Total requested
- 40.0 MW
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 30 November 2007
- Proposed online date
- June 2012
- Withdrawn
- November 2008
Location
Marker shows the centre of Mendocino County; the queue data does not give exact sites.
Power plants in California · Transmission lines in California
Other requests in Mendocino County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem