Marine Depot

Marine Depot is a 26.6 MW battery storage request withdrawn in the CAISO interconnection queue, in San Diego County, California.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2019 (completed)
  2. Withdrawn / abandonedApr 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1671
Grid region
CAISO (California)
Connection point (POI)
Point Loma Substation 69 kV
Location
San Diego County, California
Technology
Battery: 26.6 MW
Total requested
26.6 MW
Service type
Energy only (ERIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
15 April 2019
Proposed online date
October 2026
Withdrawn
April 2025

Location

Marker shows the centre of San Diego County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in San Diego County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem