SOLAR Β· CAISO

Medeiros Solar

Medeiros Solar is a 28.4 MW solar request withdrawn in the CAISO interconnection queue, in Merced County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2016 (completed)
  2. Withdrawn / abandonedJun 2024 (project stopped here)
  3. ConsentedMay 2023 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1239
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Los Banos-O'Neil PGP 70 kV Line
Location
Merced County, California
Technology
Solar: 28.4 MW
Total requested
28.4 MW
Service type
Energy only (ERIS)
Study phase
Terminated
Queue status
Withdrawn
Entered queue
2 May 2016
Agreement signed
8 May 2023
Proposed online date
December 2026
Withdrawn
June 2024

Location

Marker shows the centre of Merced County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Merced County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem