United States β€Ί Grid β€Ί Interconnection queues β€Ί California

SOLAR Β· CAISO

Golden Oasis

Golden Oasis is a 33.0 MW solar request withdrawn in the CAISO interconnection queue, in Kern County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2013 (completed)
  2. Withdrawn / abandonedApr 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
967
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Whirlwind 230 kV bus
Location
Kern County, California
Technology
Solar: 33.0 MW
Total requested
33.0 MW
Service type
Network resource (NRIS)
Study phase
Executed
Queue status
Withdrawn
Entered queue
30 April 2013
Proposed online date
April 2021
Withdrawn
April 2019

Location

Marker shows the centre of Kern County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Kern County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem