Requests shown2,186619.9 GW
Active in queue188.6 GW429 requests
Agreement signed96.2 GW235 requests
Withdrawn2,186619.9 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2,186 requests · page 33 of 44
ProjectCapacityStatusLocationRegionQueuedOnline
Castoria BESS
Battery storage
61.8 MWWithdrawn / abandoned Santa Clara, CACAISO Apr 2023target 2030
Southern Light Solar
Solar
61.6 MWWithdrawn / abandoned Fresno, CACAISO May 2016target 2020
Gonzaga Ridge Wind Farm 2
Onshore wind
61.3 MWWithdrawn / abandoned Merced, CACAISO Apr 2018target 2020
Jenson
Solar + storage
61.0 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Mango Solar
Solar
61.0 MWWithdrawn / abandoned Fresno, CACAISO May 2016target 2018
DHS Oasis Solar
Solar
60.8 MWWithdrawn / abandoned Riverside, CACAISO May 2016target 2019
NYC #1
Geothermal
60.7 MWWithdrawn / abandoned Churchill, NVCAISO May 2008target 2015
TGDV #1
Geothermal
60.7 MWWithdrawn / abandoned Churchill, NVCAISO May 2008target 2012
TGDV#2
Geothermal
60.7 MWWithdrawn / abandoned Churchill, NVCAISO May 2008target 2013
Dixie Meadows #1
Geothermal
60.7 MWWithdrawn / abandoned Churchill, NVCAISO May 2008target 2016
Robin Solar Hybrid
Solar + storage
60.5 MWWithdrawn / abandoned Monterey, CACAISO Apr 2019target 2022
Jacumba Ranch
Solar + storage
60.3 MWWithdrawn / abandoned San Diego, CACAISO Apr 2015target 2021
Haydon Energy Storage Facility
Battery storage
60.0 MWWithdrawn / abandoned San Joaquin, CACAISO May 2017target 2020
Madera Solar
Solar
60.0 MWWithdrawn / abandoned Madera, CACAISO Mar 2011target 2014
West FRY Wind Energy Project
Onshore wind
60.0 MWWithdrawn / abandoned San Bernardino, CACAISO Sep 2005target 2010
Pandora Solar
Solar
60.0 MWWithdrawn / abandoned Kern, CACAISO Apr 2014target 2018
Sycamore Expansion
Gas
60.0 MWWithdrawn / abandoned Kern, CACAISO Apr 2020target 2019
Silverleaf Solar II
Solar
60.0 MWWithdrawn / abandoned Imperial, CACAISO Nov 2011target 2014
Re Padre
Solar
60.0 MWWithdrawn / abandoned San Diego, CACAISO Mar 2011target 2013
Granite Mountain Wind Farm
Onshore wind
60.0 MWWithdrawn / abandoned San Bernardino, CACAISO Oct 2006target 2015
Transfer Ridge Wind
Onshore wind
60.0 MWWithdrawn / abandoned Butte, CACAISO Apr 2013target 2016
Central Valley
Solar
60.0 MWWithdrawn / abandoned Fresno, CACAISO Apr 2015target 2021
Huntington Beach 2
Gas
59.3 MWWithdrawn / abandoned Orange, CACAISO Apr 2013target 2023
Greenlight Solar I
Solar
58.8 MWWithdrawn / abandoned San Diego, CACAISO Jun 2008target 2010
Warner Solar I
Solar
58.8 MWWithdrawn / abandoned San Diego, CACAISO Jun 2008target 2010
Algonquin Power Sanger (Old)
Gas
58.3 MWWithdrawn / abandoned Fresno, CACAISO Jul 2009target 2011
Manzanita Wind
Onshore wind
57.5 MWWithdrawn / abandoned San Diego, CACAISO Feb 2010target 2017
Stuart Mesa Solar
Solar
56.0 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Oakland Es Unit 3
Battery storage
55.7 MWWithdrawn / abandoned Alameda, CACAISO Dec 2020target 2024
Adrian Storage
Battery storage
55.5 MWWithdrawn / abandoned San Mateo, CACAISO Apr 2021target 2031
Pacific Renewable Energy Generation LLC (Fka Lompoc Wind Power Project)
Onshore wind
55.5 MWWithdrawn / abandoned Santa Barbara, CACAISO Mar 2003target 2015
Boyce Solar Hybrid
Solar + storage
55.0 MWWithdrawn / abandoned Fresno, CACAISO Apr 2019target 2022
Victor Solar I
Solar
55.0 MWWithdrawn / abandoned Riverside, CACAISO Jun 2008target 2010
Nemo Storage
Battery storage
53.0 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Walton Energy Reliability Center
Battery storage
52.8 MWWithdrawn / abandoned Yuba, CACAISO May 2017target 2019
Sand Hill Wind 2
Onshore wind
52.5 MWWithdrawn / abandoned Alameda, CACAISO Apr 2015target 2017
NYC #2
Geothermal
52.5 MWWithdrawn / abandoned Churchill, NVCAISO May 2008target 2012
Dixie Meadows #2
Geothermal
52.5 MWWithdrawn / abandoned Churchill, NVCAISO May 2008target 2013
Easterby Energy Storage
Battery storage
52.2 MWWithdrawn / abandoned Fresno, CACAISO May 2016target 2020
Twig
Solar + storage
52.0 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Pumpkin Valley
Battery storage
52.0 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Freight Energy Storage
Battery storage
51.8 MWWithdrawn / abandoned San Diego, CACAISO Apr 2021target 2025
La Media
Battery storage
51.5 MWWithdrawn / abandoned Orange, CACAISO Apr 2023target 2029
Goal Line Reliability
Battery storage
51.4 MWWithdrawn / abandoned San Diego, CACAISO Apr 2021target 2026
Bruin Solar
Solar
51.3 MWWithdrawn / abandoned Fresno, CACAISO May 2017target 2020
Tierra Del Oro
Solar
51.2 MWWithdrawn / abandoned Kern, CACAISO May 2016target 2020
Apollo Solar
Solar
51.2 MWWithdrawn / abandoned Kern, CACAISO Mar 2011target 2013
Petrel Storage
Battery storage
51.1 MWWithdrawn / abandoned San Diego, CACAISO Apr 2021target 2024
Suffolk Storage
Battery storage
51.0 MWWithdrawn / abandoned San Diego, CACAISO Apr 2019target 2021
Horse Lake
Onshore wind
51.0 MWWithdrawn / abandoned Lassen, CACAISO Apr 2012target 2013
Page 33 of 44

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)