| Project | Capacity | Status |
|---|---|---|
| Castoria BESS Battery storage |
61.8 MW | Withdrawn / abandoned |
| Southern Light Solar Solar |
61.6 MW | Withdrawn / abandoned |
| Gonzaga Ridge Wind Farm 2 Onshore wind |
61.3 MW | Withdrawn / abandoned |
| Jenson Solar + storage |
61.0 MW | Withdrawn / abandoned |
| Mango Solar Solar |
61.0 MW | Withdrawn / abandoned |
| DHS Oasis Solar Solar |
60.8 MW | Withdrawn / abandoned |
| NYC #1 Geothermal |
60.7 MW | Withdrawn / abandoned |
| TGDV #1 Geothermal |
60.7 MW | Withdrawn / abandoned |
| TGDV#2 Geothermal |
60.7 MW | Withdrawn / abandoned |
| Dixie Meadows #1 Geothermal |
60.7 MW | Withdrawn / abandoned |
| Robin Solar Hybrid Solar + storage |
60.5 MW | Withdrawn / abandoned |
| Jacumba Ranch Solar + storage |
60.3 MW | Withdrawn / abandoned |
| Haydon Energy Storage Facility Battery storage |
60.0 MW | Withdrawn / abandoned |
| Madera Solar Solar |
60.0 MW | Withdrawn / abandoned |
| West FRY Wind Energy Project Onshore wind |
60.0 MW | Withdrawn / abandoned |
| Pandora Solar Solar |
60.0 MW | Withdrawn / abandoned |
| Sycamore Expansion Gas |
60.0 MW | Withdrawn / abandoned |
| Silverleaf Solar II Solar |
60.0 MW | Withdrawn / abandoned |
| Re Padre Solar |
60.0 MW | Withdrawn / abandoned |
| Granite Mountain Wind Farm Onshore wind |
60.0 MW | Withdrawn / abandoned |
| Transfer Ridge Wind Onshore wind |
60.0 MW | Withdrawn / abandoned |
| Central Valley Solar |
60.0 MW | Withdrawn / abandoned |
| Huntington Beach 2 Gas |
59.3 MW | Withdrawn / abandoned |
| Greenlight Solar I Solar |
58.8 MW | Withdrawn / abandoned |
| Warner Solar I Solar |
58.8 MW | Withdrawn / abandoned |
| Algonquin Power Sanger (Old) Gas |
58.3 MW | Withdrawn / abandoned |
| Manzanita Wind Onshore wind |
57.5 MW | Withdrawn / abandoned |
| Stuart Mesa Solar Solar |
56.0 MW | Withdrawn / abandoned |
| Oakland Es Unit 3 Battery storage |
55.7 MW | Withdrawn / abandoned |
| Adrian Storage Battery storage |
55.5 MW | Withdrawn / abandoned |
| Pacific Renewable Energy Generation LLC (Fka Lompoc Wind Power Project) Onshore wind |
55.5 MW | Withdrawn / abandoned |
| Boyce Solar Hybrid Solar + storage |
55.0 MW | Withdrawn / abandoned |
| Victor Solar I Solar |
55.0 MW | Withdrawn / abandoned |
| Nemo Storage Battery storage |
53.0 MW | Withdrawn / abandoned |
| Walton Energy Reliability Center Battery storage |
52.8 MW | Withdrawn / abandoned |
| Sand Hill Wind 2 Onshore wind |
52.5 MW | Withdrawn / abandoned |
| NYC #2 Geothermal |
52.5 MW | Withdrawn / abandoned |
| Dixie Meadows #2 Geothermal |
52.5 MW | Withdrawn / abandoned |
| Easterby Energy Storage Battery storage |
52.2 MW | Withdrawn / abandoned |
| Twig Solar + storage |
52.0 MW | Withdrawn / abandoned |
| Pumpkin Valley Battery storage |
52.0 MW | Withdrawn / abandoned |
| Freight Energy Storage Battery storage |
51.8 MW | Withdrawn / abandoned |
| La Media Battery storage |
51.5 MW | Withdrawn / abandoned |
| Goal Line Reliability Battery storage |
51.4 MW | Withdrawn / abandoned |
| Bruin Solar Solar |
51.3 MW | Withdrawn / abandoned |
| Tierra Del Oro Solar |
51.2 MW | Withdrawn / abandoned |
| Apollo Solar Solar |
51.2 MW | Withdrawn / abandoned |
| Petrel Storage Battery storage |
51.1 MW | Withdrawn / abandoned |
| Suffolk Storage Battery storage |
51.0 MW | Withdrawn / abandoned |
| Horse Lake Onshore wind |
51.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)