United States β€Ί Grid β€Ί Interconnection queues β€Ί California

SOLAR Β· CAISO

Stuart Mesa Solar

Stuart Mesa Solar is a 56.0 MW solar request withdrawn in the CAISO interconnection queue, connecting to SDGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2023 (completed)
  2. Withdrawn / abandonedDec 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
54852
Grid region
CAISO (California)
Utility / transmission owner
SDGE
Connection point (POI)
697 (Oceanside - San Luis Rey)
Location
California
Technology
Solar: 56.0 MW
Total requested
56.0 MW
Service type
Network resource (NRIS)
Study phase
Caiso Cluster 15 Unvalidated
Queue status
Withdrawn
Entered queue
17 April 2023
Proposed online date
July 2028
Withdrawn
December 2024

Location

Marker shows the centre of County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem