ONSHORE WIND · CAISO

Sand Hill Wind 2

Sand Hill Wind 2 is a 52.5 MW onshore wind request withdrawn in the CAISO interconnection queue, in Alameda County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2015 (completed)
  2. Withdrawn / abandonedMay 2016 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1114
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Tesla to Delta Switching Yard at the Altamont-Midway Substation
Location
Alameda County, California
Technology
Wind: 52.5 MW
Total requested
52.5 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
30 April 2015
Proposed online date
June 2017
Withdrawn
May 2016

Location

Marker shows the centre of Alameda County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Alameda County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem