Dixie Meadows #2

Dixie Meadows #2 is a 52.5 MW geothermal request withdrawn in the CAISO interconnection queue, in Churchill County, Nevada, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2008 (completed)
  2. Withdrawn / abandonedNov 2008 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
397
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Bishop Substation
Location
Churchill County, Nevada
Technology
Geothermal: 52.5 MW
Total requested
52.5 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
29 May 2008
Proposed online date
June 2013
Withdrawn
November 2008

Location

Marker shows the centre of Churchill County; the queue data does not give exact sites.

Power plants in Nevada Β· Transmission lines in Nevada

Other requests in Churchill County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem