West FRY Wind Energy Project

West FRY Wind Energy Project is a 60.0 MW onshore wind request withdrawn in the CAISO interconnection queue, in San Bernardino County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2005 (completed)
  2. Withdrawn / abandonedOct 2008 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
83
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Lugo-Pisgah No. 2 230 kV tran line
Location
San Bernardino County, California
Technology
Wind: 60.0 MW
Total requested
60.0 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
16 September 2005
Proposed online date
June 2010
Withdrawn
October 2008

Location

Marker shows the centre of San Bernardino County; the queue data does not give exact sites.