United States › Grid › Interconnection queues › California

ONSHORE WIND · CAISO

Granite Mountain Wind Farm

Granite Mountain Wind Farm is a 60.0 MW onshore wind request withdrawn in the CAISO interconnection queue, in San Bernardino County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2006 (completed)
  2. Withdrawn / abandonedOct 2013 (project stopped here)
  3. ConsentedNov 2010 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
135
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Lugo-Pisgah 230kV line
Location
San Bernardino County, California
Technology
Wind: 60.0 MW
Total requested
60.0 MW
Study phase
Executed
Queue status
Withdrawn
Entered queue
10 October 2006
Agreement signed
15 November 2010
Proposed online date
December 2015
Withdrawn
October 2013

Location

Marker shows the centre of San Bernardino County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in San Bernardino County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem