🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Texas

OCTARY USA · INTERCONNECTION QUEUES

Queue requests in study in Texas — page 3

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown1,486351.5 GW
Active in queue476.4 GW2,094 requests
Agreement signed124.6 GW606 requests
Withdrawn917184.2 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

1,486 requests · page 3 of 30
ProjectCapacityStatusLocationRegionQueuedOnline
Diamante BESS
Battery storage · Flexen USA LLC
514 MWIn study Grimes, TXERCOT Feb 2024target 2028
Old Aqueduct Solar
Solar + storage · Old Aqueduct Solar
512 MWIn study Hale, TXERCOT Dec 2020target 2028
Velveteen Solar I
Solar · Velveteen Solar, LLC
509 MWIn study Baylor, TXERCOT Dec 2025target 2029
Bayside Solar
Solar
509 MWPaused / redesign Victoria, TXERCOT Feb 2021target 2026
Dovetail Storage
Solar + storage · Hecate Energy Dovetail Storage LLC
509 MWIn study Jack, TXERCOT Sep 2021target 2027
Crescent C BESS
Battery storage · OCI La Salle ESS LLC
508 MWIn study La Salle, TXERCOT Apr 2023target 2028
Outpost Storage
Solar + storage · Hecate Energy Outpost Storage LLC
508 MWIn study Webb, TXERCOT Mar 2021target 2028
Tres Rios Ranch Solar
Solar + storage · LectricWind LLC
508 MWIn study Upton, TXERCOT Aug 2022target 2027
Bayside BESS
Battery storage
508 MWPaused / redesign Victoria, TXERCOT Mar 2022
Tumbleweed Storage
Solar + storage · Hecate Energy Tumbleweed Storage LLC
507 MWIn study Borden, TXERCOT Oct 2023target 2027
Point Mountain Storage
Battery storage
507 MWPaused / redesign Upton, TXERCOT
Fort Worth Power Core Bastrop Gas Plant
Gas · Fort Worth Power Core LLC
506 MWIn study Bastrop, TXERCOT May 2025target 2029
Tabor Solar
Solar · Quanah Solar LLC
506 MWIn study Hardeman, TXERCOT Sep 2020target 2027
Big Field Solar
Solar · Big Field Solar Energy LLC
506 MWIn study Wilbarger, TXERCOT Jun 2025target 2029
Harley Hand Solar
Solar + storage · HECTATE ENERGY HARLEY HAND SOLAR LLC
506 MWIn study Nolan, TXERCOT Dec 2019target 2029
Oriole Solar
Solar + storage · Rolling Plains Solar
504 MWIn study Knox, TXERCOT May 2023target 2028
Frye Storage
Solar + storage · Hecate Energy Frye Storage LLC
504 MWIn study Swisher, TXERCOT Sep 2020target 2026
Zeus Armstrong Solar
Solar + storage · Armstrong Solar, LLC
504 MWIn study Armstrong, TXERCOT May 2024target 2028
Hiru Storage
Solar + storage · Hecate Energy Hazel LLC
504 MWIn study Clay, TXERCOT Nov 2022target 2029
Zeus Scurry Solar
Solar + storage · Scurry Solar, LLC
504 MWIn study Scurry, TXERCOT Jun 2025target 2028
Harley Hand Storage
Solar + storage · Hecate Energy Harley Hand Solar LLC
503 MWIn study Nolan, TXERCOT Mar 2021target 2029
Cielo Vista Solar
Solar + storage · Cielo Vista Solar, LLC
503 MWIn study Duval, TXERCOT Apr 2025target 2028
Gypsum Plains Solar
Solar + storage · Gypsum Plains Solar, LLC
503 MWIn study Ector, TXERCOT Jun 2025target 2029
Pinnington Storage
Solar + storage · Hecate Energy Longhorn Storage LLC
503 MWIn study Jack, TXERCOT Dec 2020target 2029
Muy Grande Solar
Solar · ACE DevCo NC, LLC
503 MWIn study Starr, TXERCOT Jan 2024target 2029
Dog Star Solar II
Solar · Dog Star Solar LLC
503 MWIn study Taylor, TXERCOT Jul 2025target 2027
Dog Star Solar I
Solar · Dog Star Solar LLC
503 MWIn study Taylor, TXERCOT Jul 2025target 2027
River Boat Solar
Solar + storage · Champion Creek Solar, LLC
502 MWIn study Mitchell, TXERCOT Sep 2024target 2028
Commodus Solar
Solar · IP Blackwell, LLC
502 MWIn study Briscoe, TXERCOT Jul 2024target 2029
Cavell Solar
Solar · IP Cavell, LLC
502 MWIn study Castro, TXERCOT Jul 2024target 2029
Commodus 2 Solar
Solar · IP Blackwell II, LLC
502 MWIn study Swisher, TXERCOT Mar 2025target 2029
Freedom Falcon BESS
Battery storage · Falcon BESS, LLC
502 MWIn study Zapata, TXERCOT Jun 2023target 2028
Titus Sienta Solar
Solar · Sol Sienta Solar, LLC
502 MWIn study Pecos, TXERCOT Oct 2023target 2028
Orbit Energy Storage
Battery storage · GCI Orbit Energy Storage, LLC
502 MWIn study Bexar, TXERCOT Nov 2023target 2027
Millsing BESS
Battery storage · Millsing BESS
502 MWIn study Grimes, TXERCOT Feb 2024target 2028
MRR Solar
Solar · BOULEVARD ASSOCIATES, LLC
500 MWIn study Pecos, TXERCOT Jul 2025target 2030
Elk Ridge Solar
Solar · Boulevard Associates, LLC
500 MWIn study Pecos, TXERCOT Nov 2025target 2030
Solar + storage project GEN-2024-266, Potter County
Solar + storage
500 MWIn study Potter, TXSPP Mar 2025target 2033
Draco Solar
Solar · Draco Solar LLC
500 MWIn study Borden, TXERCOT Apr 2025target 2027
Aquila Solar
Solar · Ben Milam Solar 5
500 MWIn study Milam, TXERCOT Nov 2025target 2026
Onshore wind project ERAS-2025-021, Hale County
Onshore wind
500 MWIn study Hale, TXSPP Oct 2025target 2030
Betel Storage I
Battery storage · BETEL STORAGE I
500 MWIn study Milam, TXERCOT Jan 2025target 2026
Betel Storage II
Battery storage · BETEL STORAGE II
500 MWIn study Milam, TXERCOT Jan 2025target 2026
Black Mountain Somervell Gas Combined
Gas · Fort Worth Power Core LLC
495 MWIn study Somervell, TXERCOT Apr 2025target 2029
Siete Wind
Onshore wind · Siete Wind, LLC
493 MWIn study Webb, TXERCOT Jul 2025target 2028
Halyard Wharton
Gas · Halyard Energy
484 MWPaused / redesign Wharton, TXERCOT Mar 2014target 2021
North Royal Thermal (TEF- Due Diligence)
Gas · Invenergy Energy Transition Development LLC
479 MWIn study Lamar, TXERCOT Jun 2024target 2030
Mirando Valley Wind
Onshore wind · ACE DevCo NC LLC
479 MWIn study Jim Hogg, TXERCOT Aug 2024target 2028
Gas project E0032, San Jacinto County
Gas · Entergy Texas, Inc.
478 MWIn study San Jacinto, TXMISO Aug 2025target 2027
Alkali Creek Wind
Onshore wind · Alkali Creek Wind, LLC
474 MWIn study Fisher, TXERCOT Aug 2025target 2028
Page 3 of 30

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)