🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › California

OCTARY USA · INTERCONNECTION QUEUES

Withdrawn queue requests in California — page 3

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown2,138571.6 GW
Active in queue179.2 GW464 requests
Agreement signed81.7 GW215 requests
Withdrawn2,138571.6 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2,138 requests · page 3 of 43
ProjectCapacityStatusLocationRegionQueuedOnline
Center Power
Gas
910 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2013target 2024
Mira Loma Hybrid Power Project
Gas
910 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2014target 2020
Viejo Hybrid Power
Gas
910 MWWithdrawn / abandoned Riverside, CACAISO Apr 2014target 2019
Cadiz West
Solar
900 MWWithdrawn / abandoned San Bernardino, CACAISO May 2008target 2015
Encina Generating Project (PH. 1 And 2)
Gas
900 MWWithdrawn / abandoned San Diego, CACAISO Aug 2000target 2008
Yuha Desert Battery Storage 2
Battery storage
900 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Wonder Solar
Solar + storage
892 MWWithdrawn / abandoned CACAISO Apr 2023target 2029
Three Rocks
Solar + storage
878 MWWithdrawn / abandoned CACAISO Apr 2021target 2024
Cosmos
Battery storage
874 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Magic Valley Wind 2
Wind + storage
871 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
K Road Calico Solar LLC (KRCS) (Fka Calico Solar 1; Ses Solar One)
Solar
850 MWWithdrawn / abandoned San Bernardino, CACAISO May 2005target 2013
Gas project Q31, San Bernardino County
Gas
850 MWWithdrawn / abandoned San Bernardino, CAWest Jul 2012target 2015
Other project Q57, San Bernardino County
Other
850 MWWithdrawn / abandoned San Bernardino, CAWest Jan 2017target 2020
Clearwater Solar Generating Station
Solar
840 MWWithdrawn / abandoned Los Angeles, CACAISO Jun 2008target 2014
Blue Star Energy Storage
Battery storage
829 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Brea Linda Energy Storage
Battery storage
829 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Brown Bear Energy Storage
Battery storage
829 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Solar Farm Energy Center
Solar + storage
822 MWWithdrawn / abandoned Tulare, CACAISO Apr 2021target 2026
Hadselville
Solar + storage
816 MWWithdrawn / abandoned Stanislaus, CACAISO Apr 2021target 2025
Estanislau Solar Storage
Solar + storage
816 MWWithdrawn / abandoned San Joaquin, CACAISO Apr 2021target 2024
Yeager Mustang
Solar + storage
815 MWWithdrawn / abandoned Kern, CACAISO Apr 2021target 2027
Yeager Hybrid Solar
Solar + storage
813 MWWithdrawn / abandoned Kern, CACAISO Apr 2019target 2022
Longhorn 1
Solar + storage
812 MWWithdrawn / abandoned Kern, CACAISO Apr 2020target 2024
Ibis
Solar + storage
811 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
WSP 3
Solar
800 MWWithdrawn / abandoned Kings, CACAISO Mar 2011target 2018
Ventura Clean Energy
Gas
778 MWWithdrawn / abandoned Ventura, CACAISO Apr 2013target 2019
Muscat
Battery storage
772 MWWithdrawn / abandoned CACAISO Apr 2021target 2024
Central Coast Wind 1
Onshore wind
772 MWWithdrawn / abandoned Santa Barbara, CACAISO Apr 2020target 2027
Trilobite Solar Project
Solar
750 MWWithdrawn / abandoned San Bernardino, CACAISO Dec 2007target 2012
Palo Verde Mesa (Fka Brightsource Midpoint Solar)
Solar
750 MWWithdrawn / abandoned Riverside, CACAISO Jul 2010target 2015
San Diego Community Power Generating Station
Gas
750 MWWithdrawn / abandoned San Diego, CACAISO Nov 2000target 2010
California City Solar
Solar
732 MWWithdrawn / abandoned Kern, CACAISO May 2016target 2020
Fairfield Energy Center - 730 MW
Gas
730 MWWithdrawn / abandoned Solano, CACAISO Jun 2008target 2012
Gigantes Solar
Solar
730 MWWithdrawn / abandoned Imperial, CACAISO May 2016target 2020
Bpae Kern Front
Gas
725 MWWithdrawn / abandoned Kern, CACAISO Apr 2007target 2013
Icarus Wind and Solar
Solar + storage
719 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Bradmoor Solar
Solar + storage
719 MWWithdrawn / abandoned Solano, CACAISO Apr 2019target 2022
Bright Star Hybrid
Solar + storage
719 MWWithdrawn / abandoned San Joaquin, CACAISO Apr 2019target 2022
Sur Vista
Solar + storage
718 MWWithdrawn / abandoned Kern, CACAISO Apr 2021target 2024
Juglans Energy Storage
Battery storage
711 MWWithdrawn / abandoned Solano, CACAISO Apr 2021target 2031
Adastra Hybrid Solar
Solar + storage
709 MWWithdrawn / abandoned Tulare, CACAISO Apr 2021target 2025
Mesaville Solar
Solar + storage
706 MWWithdrawn / abandoned Riverside, CACAISO May 2017target 2022
Rock Dove 1 Energy Center
Solar + storage
701 MWWithdrawn / abandoned Kern, CACAISO Apr 2020target 2024
Rock Dove 2 Energy Center
Solar + storage
701 MWWithdrawn / abandoned Kern, CACAISO Apr 2020target 2025
Santa Ana Energy Center
Gas
700 MWWithdrawn / abandoned Orange, CACAISO Apr 2014target 2018
Blythe III
Gas
700 MWWithdrawn / abandoned Riverside, CACAISO Jan 2007target 2012
PV-49
Solar
700 MWWithdrawn / abandoned Kern, CACAISO May 2008target 2011
PV-47
Solar
700 MWWithdrawn / abandoned Kern, CACAISO May 2008target 2011
PV-48
Solar
700 MWWithdrawn / abandoned Kern, CACAISO May 2008target 2013
Desert Quartzsite PV
Solar
700 MWWithdrawn / abandoned Riverside, CACAISO Nov 2007target 2015
Page 3 of 43

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)