GAS · CAISO

Encina Generating Project (PH. 1 And 2)

Encina Generating Project (PH. 1 And 2) is a 900 MW gas request withdrawn in the CAISO interconnection queue, in San Diego County, California, connecting to SDGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2000 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
5
Grid region
CAISO (California)
Utility / transmission owner
SDGE
Connection point (POI)
Encina Power Plant Switchyard
Location
San Diego County, California
Technology
Gas: 900 MW
Total requested
900 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
9 August 2000
Proposed online date
June 2008

Location

Marker shows the centre of San Diego County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in San Diego County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem