Solar Farm Energy Center

Solar Farm Energy Center is a 822 MW solar + storage request withdrawn in the CAISO interconnection queue, in Tulare County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2021 (completed)
  2. Withdrawn / abandonedOct 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
2084
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Rector Substation 230kV
Location
Tulare County, California
Technology
Solar: 411 MW · Battery: 411 MW
Total requested
822 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
15 April 2021
Proposed online date
November 2026
Withdrawn
October 2022

Location

Marker shows the centre of Tulare County; the queue data does not give exact sites.