Mira Loma Hybrid Power Project

Mira Loma Hybrid Power Project is a 910 MW gas request withdrawn in the CAISO interconnection queue, in San Bernardino County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2014 (completed)
  2. Withdrawn / abandonedJul 2014 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1085
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Mira Loma Substation 220kV Tap
Location
San Bernardino County, California
Technology
Gas: 860 MW · Battery: 50.0 MW
Total requested
910 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
30 April 2014
Proposed online date
June 2020
Withdrawn
July 2014

Location

Marker shows the centre of San Bernardino County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in San Bernardino County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem