Queue requests in study in Texas — page 28

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown1,486351.5 GW
Active in queue476.4 GW2,094 requests
Agreement signed124.6 GW606 requests
Withdrawn917184.2 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

1,486 requests · page 28 of 30
ProjectCapacityStatusLocationRegionQueuedOnline
Lamar Unit 1 Repower
Gas · La Frontera Holdings, LLC
66.0 MWIn study Lamar, TXERCOT Jun 2022target 2027
Smith Lake Storage DC
Solar + storage · Smith Lake Solar
65.0 MWIn study Grimes, TXERCOT Mar 2022target 2028
Demeter Storage
Solar + storage · Demeter Solar, LLC
65.0 MWIn study Caldwell, TXERCOT Aug 2022target 2029
PRI Solar
Solar · BHER Power Resources, Inc.
63.8 MWIn study Howard, TXERCOT Jul 2025target 2027
Iron Cowboy Storage
Solar + storage · Vaquero II Storage, LLC
63.3 MWIn study San Patricio, TXERCOT Jun 2025target 2028
Angus Storage
Battery storage
63.0 MWPaused / redesign Bosque, TXERCOT Nov 2017
Little Star Solar
Solar · RWE Clean Energy Development, LLC
61.6 MWIn study Bastrop, TXERCOT Jul 2024target 2026
Beaverhead Solar SLF
Solar + storage · Beaverhead Solar, LLC
61.5 MWIn study Jim Wells, TXERCOT Aug 2024target 2027
Beaverhead Storage SLF
Solar + storage · Beaverhead Solar, LLC
61.5 MWIn study Jim Wells, TXERCOT Aug 2024target 2027
Centennial Solar
Solar · Centennial AD 8 LLC
61.4 MWIn study Menard, TXERCOT Jan 2024target 2029
Nymphaea Storage
Solar + storage · Nymphaea Solar, LLC
61.0 MWIn study Wichita, TXERCOT Sep 2022target 2028
Celeste Energy Storage
Battery storage
60.9 MWPaused / redesign Pecos, TXERCOT Apr 2020
Fallstone Solar SLF
Solar + storage · Fallstone Solar, LLC
60.6 MWIn study Falls, TXERCOT Dec 2024target 2028
Hondo Arroyo Solar
Solar + storage · Hondo Creek Solar, LLC
60.4 MWIn study Medina, TXERCOT Jun 2024target 2028
Borden Dino BESS
Solar + storage · Borden Dino Solar, LLC
60.3 MWIn study Borden, TXERCOT Apr 2025target 2028
Tipperary Solar
Solar · Tippsol
60.2 MWIn study Schleicher, TXERCOT Jun 2024target 2028
Stonewall Solar
Solar + storage · Stonewall PV, LLC
60.2 MWIn study Stonewall, TXERCOT May 2024target 2029
Lampe Solar
Solar · Gransolar Texas Seven LLC
60.2 MWIn study Washington, TXERCOT Aug 2021target 2027
Indigo Storage 4
Solar + storage · Innovative Solar 245, LLC
60.0 MWIn study Fisher, TXERCOT Oct 2023target 2026
Indigo Storage 2
Solar + storage · Innovative Solar 245, LLC
60.0 MWIn study Fisher, TXERCOT Sep 2023target 2026
Agate Solar
Solar
60.0 MWPaused / redesign Ellis, TXERCOT Aug 2017
Indigo Storage
Solar + storage · Innovative Solar 245, LLC
60.0 MWIn study Fisher, TXERCOT Dec 2022target 2026
HIP ESS Project
Other
60.0 MWPaused / redesign Leon, TXERCOT
Indigo Storage 3
Solar + storage · Innovative Solar 245, LLC
60.0 MWIn study Fisher, TXERCOT Nov 2023target 2026
R Massengale
Gas
58.0 MWPaused / redesign Lubbock, TXERCOT Sep 2018target 2021
Chatee Solar
Solar · Hecate Energy
57.0 MWPaused / redesign Pecos, TXERCOT Apr 2015target 2020
Whistle Solar
Solar · Gransolar Texas Nineteen, LLC
56.3 MWIn study Navarro, TXERCOT Nov 2021target 2028
Silver Hills Windpower
Onshore wind · Silver Hills Windpower, LLC
54.1 MWIn study Howard, TXERCOT Apr 2025target 2029
Donna BESS
Solar + storage · Donna Solar LLC
53.9 MWIn study Hidalgo, TXERCOT Mar 2024target 2029
Paloma Energy Center BESS
Solar + storage · Harrison Street Development, LLC
53.6 MWIn study Colorado, TXERCOT Feb 2024target 2027
Wagon Timber Storage
Solar + storage · Wagon Timber Storage, LLC
53.5 MWIn study Knox, TXERCOT Jan 2025target 2028
Fighting Jays Battery
Battery storage
53.2 MWPaused / redesign Fort Bend, TXERCOT Aug 2021
Mars Solar
Solar
52.8 MWPaused / redesign Childress, TXERCOT Feb 2019
Onshore wind project GEN-2026-PR1, Ochiltree County
Onshore wind
52.6 MWIn study Ochiltree, TXSPP Dec 2025target 2030
Solar project GEN-2023-135, Bowie County
Solar
52.0 MWIn study Bowie, TXSPP Oct 2023target 2026
Sunbelt Storage
Solar + storage · Rose Hill Solar LLC
52.0 MWIn study Kaufman, TXERCOT Nov 2021target 2026
Steppe Reserve Storage
Battery storage · KCE TX 25, LLC
51.9 MWIn study Dimmit, TXERCOT Jan 2021target 2028
Orchard Ray BESS
Battery storage · Pettus BESS
51.9 MWIn study Bee, TXERCOT Jun 2023target 2027
Fluvanna Max BESS SLF
Solar + storage · Fluvanna Max Solar LLC
51.8 MWIn study Scurry, TXERCOT Dec 2024target 2029
Findley BESS
Solar + storage · Gransolar Texas Sixteen, LLC
51.7 MWIn study Limestone, TXERCOT Feb 2024target 2028
High Chaparral BESS 138kV
Battery storage · High Chaparral Solar Project, LLC
51.7 MWPaused / redesign Brazoria, TXERCOT Jan 2021target 2023
Proving Ground BESS
Solar + storage · Lantana Solar LLC
51.4 MWIn study Schleicher, TXERCOT Jul 2023target 2028
GPlains Storage
Solar + storage · Gypsum Plains Solar, LLC
51.3 MWIn study Ector, TXERCOT Apr 2025target 2029
Big River BESS
Solar + storage · Rio Grande River Solar LLC
51.3 MWIn study Zapata, TXERCOT May 2021target 2028
Ayass BESS
Battery storage · Harvick BESS, LLC
51.3 MWIn study Throckmorton, TXERCOT Dec 2023target 2028
Black Bear BESS
Solar + storage · ESCONDIDO DRAW RESOURCES, LLC
51.2 MWIn study Crockett, TXERCOT Dec 2023target 2028
Crocus Storage
Solar + storage · Crocus Solar, LLC
51.0 MWIn study Stephens, TXERCOT Jan 2025target 2028
Blanket Ranch North Storage
Solar + storage · Blanket Ranch North Solar, LLC
50.9 MWIn study Brown, TXERCOT Jun 2022target 2028
Volunteer Storage
Battery storage · Blackjack Storage LLC
50.6 MWIn study Caldwell, TXERCOT Jan 2019target 2028
Hooper Solar
Solar + storage · BT Brown Solar, LLC
50.5 MWIn study Lee, TXERCOT Dec 2022target 2027
Page 28 of 30

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)