Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Trelina Energy Storage Battery storage Β· NextEra Energy Resources Interconnection Holdings, LLC |
120 MW | In study |
| Elevate Bethlehem Battery storage Β· Lighthouse Bethlehem, LLC |
120 MW | In study |
| Buffalo Road Energy Storage Battery storage Β· MN8 Energy Development Company LLC |
100 MW | In study |
| Coral Energy Storage Battery storage Β· Hanwha Q CELLS USA Corp. |
100 MW | In study |
| Mill Point Solar II Solar + storage Β· ConnectGen Montgomery County LLC |
100 MW | In study |
| South Bronx Energy Storage Battery storage Β· Prologis Energy LLC |
100 MW | In study |
| Marlboro Storage Battery storage Β· Origis Development LLC |
100 MW | In study |
| Eastwater Energy Storage Battery storage Β· GCI Eastwater, LLC |
100 MW | In study |
| Horseblock Energy Storage Battery storage Β· ACE DevCo NC, LLC |
100 MW | In study |
| Zenobe Burns LLC Battery storage Β· Zenobe Americas Inc. |
100 MW | In study |
| Alcazar 1 Battery storage Β· Terra-Gen Development Company, LLC |
100 MW | In study |
| Fort Edward Solar Farm (NY53) Solar Β· Fort Edward Solar LLC |
100 MW | In study |
| Arch 3 Battery storage Β· Terra-Gen Development Company, LLC |
100 MW | In study |
| Kce NY 34 Battery storage Β· KCE NY 34, LLC |
100 MW | In study |
| Jericho Solar Solar Β· Jericho Solar Park LLC |
100 MW | In study |
| Aria Storage 1 Battery storage Β· Terra-Gen Development Company, LLC |
100 MW | In study |
| Hemlock Hollow Wind Onshore wind Β· Liberty Renewables Inc. |
95.0 MW | In study |
| Hell Gate Energy Storage Battery storage Β· the NY Power Authority |
90.0 MW | In study |
| Bassett Energy Storage Battery storage Β· Bassett Energy Storage |
79.9 MW | In study |
| Daphne Energy Storage Battery storage Β· Hanwha Q CELLS USA Corp. |
75.0 MW | In study |
| Leo Energy Storage Battery storage Β· BGTF US Development Holdings LLC |
75.0 MW | In study |
| Dewdrop Wind Onshore wind Β· Dewdrop Wind LLC |
62.0 MW | In study |
| Cayuga Solar Solar Β· Cayuga Lake Solar, LLC |
60.0 MW | In study |
| Kce NY 21 Battery storage Β· KCE NY 21, LLC |
60.0 MW | In study |
| Town Line Solar Phase II Solar + storage Β· RWE Solar Development, LLC |
60.0 MW | In study |
| Sandlot IFB Battery storage Β· Sandlot Energy LLC |
50.0 MW | In study |
| Azalea Wind 1 Onshore wind Β· Azalea Wind LLC |
50.0 MW | In study |
| Azalea Wind 2 Onshore wind Β· Azalea Wind LLC |
50.0 MW | In study |
| Kce NY 31 Battery storage Β· KCE NY 31, LLC |
50.0 MW | In study |
| Porter Energy Storage Battery storage Β· BGTF US Development Holdings LLC |
50.0 MW | In study |
| Kce NY 30 Battery storage Β· KCE NY 30, LLC |
50.0 MW | In study |
| Buttercup Wind Onshore wind Β· Buttercup Wind LLC |
49.9 MW | In study |
| Brentwood Energy Storage Battery storage Β· the NY Power Authority |
49.1 MW | In study |
| Pouch Energy Storage System Battery storage Β· the NY Power Authority |
47.1 MW | In study |
| Troy Heights Energy Storage Battery storage Β· Nexamp Solar LLC |
40.0 MW | In study |
| Sherburne Storage Battery storage Β· Nexamp Solar LLC |
40.0 MW | In study |
| Goldenrod Wind Onshore wind Β· Goldenrod Wind LLC |
39.0 MW | In study |
| Hoffman Falls Wind 2 Onshore wind Β· Liberty Renewables Inc. |
29.8 MW | In study |
| Oswego Clean Energy Solar Β· Oswego Clean Energy Holdings |
24.9 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)436 Β· 104.7 GW
- MISO (Midcontinent)290 Β· 62.9 GW
- West (non-ISO utilities)192 Β· 45.5 GW
- Southeast (non-ISO utilities)178 Β· 35.0 GW
- SPP (Southwest Power Pool)81 Β· 18.0 GW
- NYISO (New York)89 Β· 15.6 GW
- ISO-NE (New England)15 Β· 3,285 MW
- PJM (Mid-Atlantic, Midwest)2 Β· 95.0 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)