United States › Grid › Interconnection queues › New York
ONSHORE WIND · NYISOHemlock Hollow Wind
Hemlock Hollow Wind is a 95.0 MW onshore wind request in interconnection study in the NYISO interconnection queue, in Cattaraugus County, New York, connecting to NM-NG.
Queue statusIn planning
- PlanningQueued Aug 2024 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Sep 2029 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- C24-052-001
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NM-NG
- Developer
- Liberty Renewables Inc.
- Connection point (POI)
- Dugan - Homer Hill 115kV, Line #155
- Location
- Cattaraugus County, New York
- Technology
- Wind: 95.0 MW
- Total requested
- 95.0 MW
- Queue status
- Active
- Entered queue
- 1 August 2024
- Proposed online date
- September 2029
Location
Marker shows the centre of Cattaraugus County; the queue data does not give exact sites.
Other requests in Cattaraugus County
- Alle Catt II WindOnshore wind · 339 MW · in study
- 5Mile Storage ProjectBattery storage · 360 MW · withdrawn
- Machias IIOnshore wind · 200 MW · withdrawn
- Cold Creek Spring WindOnshore wind · 151 MW · withdrawn
- Bone Run WindOnshore wind · 132 MW · withdrawn
- Alle Catt WindOnshore wind · 101 MW · withdrawn
- Allegany WindparkOnshore wind · 101 MW · withdrawn
- SW EnergyBattery storage · 100 MW · withdrawn
- Farmersville WindparkOnshore wind · 100 MW · withdrawn
- Machias Wind FarmOnshore wind · 90.0 MW · withdrawn
- Hemlock Hollow WindOnshore wind · 87.9 MW · withdrawn
- Machias IOnshore wind · 79.2 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem