BATTERY STORAGE · NYISO5Mile Storage Project
5Mile Storage Project is a 360 MW battery storage request withdrawn in the NYISO interconnection queue, in Cattaraugus County, New York, connecting to NM-NG.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2024 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- C24-356
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NM-NG
- Developer
- Five Mile Energy, LLC
- Connection point (POI)
- Five Mile 345 kV
- Location
- Cattaraugus County, New York
- Technology
- Battery: 360 MW
- Total requested
- 360 MW
- Queue status
- Withdrawn
- Entered queue
- 15 October 2024
Location
Marker shows the centre of Cattaraugus County; the queue data does not give exact sites.
Other requests in Cattaraugus County
- Alle Catt II WindOnshore wind · 339 MW · in study
- Hemlock Hollow WindOnshore wind · 95.0 MW · in study
- Machias IIOnshore wind · 200 MW · withdrawn
- Cold Creek Spring WindOnshore wind · 151 MW · withdrawn
- Bone Run WindOnshore wind · 132 MW · withdrawn
- Alle Catt WindOnshore wind · 101 MW · withdrawn
- Allegany WindparkOnshore wind · 101 MW · withdrawn
- SW EnergyBattery storage · 100 MW · withdrawn
- Farmersville WindparkOnshore wind · 100 MW · withdrawn
- Machias Wind FarmOnshore wind · 90.0 MW · withdrawn
- Hemlock Hollow WindOnshore wind · 87.9 MW · withdrawn
- Machias IOnshore wind · 79.2 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem