United States βΊ Grid βΊ Interconnection queues βΊ New York
ONSHORE WIND Β· NYISOMachias II
Machias II is a 200 MW onshore wind request withdrawn in the NYISO interconnection queue, in Cattaraugus County, New York, connecting to NYSEG.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2008 (completed)
- Withdrawn / abandonedApr 2009 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 286
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NYSEG
- Developer
- Machias Wind Farm, LLC
- Connection point (POI)
- 345kV
- Location
- Cattaraugus County, New York
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Queue status
- Withdrawn
- Entered queue
- 27 March 2008
- Withdrawn
- April 2009
Location
Marker shows the centre of Cattaraugus County; the queue data does not give exact sites.
Other requests in Cattaraugus County
- Alle Catt II WindOnshore wind Β· 339 MW Β· in study
- Hemlock Hollow WindOnshore wind Β· 95.0 MW Β· in study
- 5Mile Storage ProjectBattery storage Β· 360 MW Β· withdrawn
- Cold Creek Spring WindOnshore wind Β· 151 MW Β· withdrawn
- Bone Run WindOnshore wind Β· 132 MW Β· withdrawn
- Alle Catt WindOnshore wind Β· 101 MW Β· withdrawn
- Allegany WindparkOnshore wind Β· 101 MW Β· withdrawn
- SW EnergyBattery storage Β· 100 MW Β· withdrawn
- Farmersville WindparkOnshore wind Β· 100 MW Β· withdrawn
- Machias Wind FarmOnshore wind Β· 90.0 MW Β· withdrawn
- Hemlock Hollow WindOnshore wind Β· 87.9 MW Β· withdrawn
- Machias IOnshore wind Β· 79.2 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem