United States › Grid › Interconnection queues › New York
SOLAR · NYISOOswego Clean Energy
Oswego Clean Energy is a 24.9 MW solar request in interconnection study in the NYISO interconnection queue, in Oswego County, New York, connecting to NM-NG.
Queue statusIn planning
- PlanningQueued Sep 2024 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- C24-293
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NM-NG
- Developer
- Oswego Clean Energy Holdings
- Connection point (POI)
- Oswego 115 kV Substation
- Location
- Oswego County, New York
- Technology
- Solar: 24.9 MW
- Total requested
- 24.9 MW
- Queue status
- Active
- Entered queue
- 27 September 2024
- Proposed online date
- December 2026
Location
Marker shows the centre of Oswego County; the queue data does not give exact sites.
Other requests in Oswego County
- ELP Granby Solar IISolar + storage · 20.0 MW · in study
- Nine Mile Point UprateNuclear · 168 MW · built
- Nine Mile Point UprateNuclear · 168 MW · built
- Sithe IndependenceGas · 27.0 MW · built
- Sithe IndependenceGas · 27.0 MW · built
- FultonHydro · 1.3 MW · built
- FultonHydro · 1.3 MW · built
- Nine Mile Point Station Unit #3Nuclear · 1,660 MW · withdrawn
- OswegoBattery storage · 1,000 MW · withdrawn
- Sage Creek SolarSolar · 250 MW · withdrawn
- Sage Creek SolarSolar · 250 MW · withdrawn
- Independence BESSBattery storage · 200 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem