HYDRO Β· NYISOFulton
Fulton is a 1.3 MW hydro request built and operating in the NYISO interconnection queue, connecting to NM-NG.
Request details
- Queue ID
- 583
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NM-NG
- Developer
- Erie Boulevard Hydropower, LP
- Connection point (POI)
- Fay St. 34.5kV
- Location
- New York
- Technology
- Hydro: 1.3 MW
- Total requested
- 1.3 MW
- Study phase
- FES, SRIS, FS
- Queue status
- Operational
- Entered queue
- 31 October 2016
Location
Marker shows the centre of County; the queue data does not give exact sites.
Other requests in County
- Oswego Clean EnergySolar Β· 24.9 MW Β· in study
- ELP Granby Solar IISolar + storage Β· 20.0 MW Β· in study
- Nine Mile Point UprateNuclear Β· 168 MW Β· built
- Nine Mile Point UprateNuclear Β· 168 MW Β· built
- Sithe IndependenceGas Β· 27.0 MW Β· built
- Sithe IndependenceGas Β· 27.0 MW Β· built
- FultonHydro Β· 1.3 MW Β· built
- Nine Mile Point Station Unit #3Nuclear Β· 1,660 MW Β· withdrawn
- OswegoBattery storage Β· 1,000 MW Β· withdrawn
- Sage Creek SolarSolar Β· 250 MW Β· withdrawn
- Sage Creek SolarSolar Β· 250 MW Β· withdrawn
- Independence BESSBattery storage Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem