United States › Grid › Interconnection queues › New York
BATTERY STORAGE · NYISOSherburne Storage
Sherburne Storage is a 40.0 MW battery storage request in interconnection study in the NYISO interconnection queue, in Chenango County, New York, connecting to NYSEG.
Queue statusIn planning
- PlanningQueued Oct 2024 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2028 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- C24-318
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NYSEG
- Developer
- Nexamp Solar LLC
- Connection point (POI)
- County Line 46 kV Substation
- Location
- Chenango County, New York
- Technology
- Battery: 40.0 MW
- Total requested
- 40.0 MW
- Queue status
- Active
- Entered queue
- 4 October 2024
- Proposed online date
- December 2028
Location
Marker shows the centre of Chenango County; the queue data does not give exact sites.
Other requests in Chenango County
- High Bridge WindOnshore wind · 101 MW · in study
- Puckett SolarSolar · 20.0 MW · built
- Puckett SolarSolar · 20.0 MW · built
- JennisonCoal · 650 MW · withdrawn
- JennisonCoal · 536 MW · withdrawn
- North Norwich SolarSolar + storage · 120 MW · withdrawn
- Solar Generation Jennison Revitalization FacilitySolar · 118 MW · withdrawn
- Brookfield Wind EnergyOnshore wind · 100 MW · withdrawn
- Regan SolarSolar · 20.0 MW · withdrawn
- Puckett SolarSolar · 20.0 MW · withdrawn
- High Bridge BatteryBattery storage · 5.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem