United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in CAISO (California) — page 18
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Palmas C5 Solar |
238 MW | Withdrawn / abandoned |
| Palmas (Fka Hyder Solar) Solar |
238 MW | Withdrawn / abandoned |
| Powwow Solar + storage |
236 MW | Withdrawn / abandoned |
| Robin 3 Solar + storage |
235 MW | Withdrawn / abandoned |
| Longspur 11 Solar + storage |
234 MW | Withdrawn / abandoned |
| Cannae Solar + storage |
234 MW | Withdrawn / abandoned |
| Alba Solar + storage |
233 MW | Withdrawn / abandoned |
| Helios Secondus Solar |
232 MW | Withdrawn / abandoned |
| Solitude Hybrid Solar + storage |
232 MW | Withdrawn / abandoned |
| Blue Bird Solar + storage |
232 MW | Withdrawn / abandoned |
| Willow Springs Solar Generating Station Solar |
231 MW | Withdrawn / abandoned |
| Suntower Gaskell Generating Station Solar |
231 MW | Withdrawn / abandoned |
| Trigo Solar + storage |
230 MW | Withdrawn / abandoned |
| Irrigosa Solar + storage |
230 MW | Withdrawn / abandoned |
| River Bluff Solar Energy Park Solar |
230 MW | Withdrawn / abandoned |
| Hallows Battery storage |
230 MW | Withdrawn / abandoned |
| Sagebrush 6 Hybrid Solar + storage |
230 MW | Withdrawn / abandoned |
| Allium Solar + storage |
229 MW | Withdrawn / abandoned |
| Shavers Valley Wind Farm Onshore wind |
228 MW | Withdrawn / abandoned |
| Allegro Hybrid Solar Solar + storage |
227 MW | Withdrawn / abandoned |
| Mule Car Battery storage |
227 MW | Withdrawn / abandoned |
| Lacuna Energy Storage Battery storage |
227 MW | Withdrawn / abandoned |
| Flyway Solar Solar + storage |
227 MW | Withdrawn / abandoned |
| Elbow Gas |
225 MW | Withdrawn / abandoned |
| Stoneman Battery storage |
225 MW | Withdrawn / abandoned |
| Beauchamp 2 Solar Solar + storage |
225 MW | Withdrawn / abandoned |
| Sagebrush Solar 5 Solar |
224 MW | Withdrawn / abandoned |
| SP Blythe 1 Solar |
221 MW | Withdrawn / abandoned |
| Angeles Energy Storage Battery storage |
220 MW | Withdrawn / abandoned |
| Harbor II Gas |
220 MW | Withdrawn / abandoned |
| Placer Solar PV I Solar |
220 MW | Withdrawn / abandoned |
| California Solar One Solar |
220 MW | Withdrawn / abandoned |
| Hood 2 Solar |
220 MW | Withdrawn / abandoned |
| Johanna Energy Center (Fka Johanna Energy Center LMS) Gas |
220 MW | Withdrawn / abandoned |
| Hood 3 Solar |
220 MW | Withdrawn / abandoned |
| Madera Solar PV I (Fka Wheeler Ridge Solar PV1) Solar |
220 MW | Withdrawn / abandoned |
| Rangeland Solar Solar + storage |
217 MW | Withdrawn / abandoned |
| Myrtle Solar + storage |
216 MW | Withdrawn / abandoned |
| Tumey Hills Solar Battery storage |
216 MW | Withdrawn / abandoned |
| Tumey Hills Energy Storage Battery storage |
216 MW | Withdrawn / abandoned |
| Brooks Solar + storage |
215 MW | Withdrawn / abandoned |
| Cuesta Solar + storage |
215 MW | Withdrawn / abandoned |
| Minden Solar + storage |
215 MW | Withdrawn / abandoned |
| Winter Harvest Solar + storage |
215 MW | Withdrawn / abandoned |
| Zinc BESS Battery storage |
214 MW | Withdrawn / abandoned |
| Feather Energy Storage Battery storage |
214 MW | Withdrawn / abandoned |
| Salt Flat Energy Storage Battery storage |
214 MW | Withdrawn / abandoned |
| Sunridge Storage Battery storage |
214 MW | Withdrawn / abandoned |
| Goldenstar Energy Storage Battery storage |
214 MW | Withdrawn / abandoned |
| Timber Energy Storage Battery storage |
214 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)