🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Withdrawn queue requests in CAISO (California) — page 18

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown2,186619.9 GW
Active in queue188.6 GW429 requests
Agreement signed96.2 GW235 requests
Withdrawn2,186619.9 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2,186 requests · page 18 of 44
ProjectCapacityStatusLocationRegionQueuedOnline
Palmas C5
Solar
238 MWWithdrawn / abandoned Yuma, AZCAISO Apr 2012target 2014
Palmas (Fka Hyder Solar)
Solar
238 MWWithdrawn / abandoned Yuma, AZCAISO Jul 2010target 2013
Powwow
Solar + storage
236 MWWithdrawn / abandoned San Diego, CACAISO Apr 2020target 2022
Robin 3
Solar + storage
235 MWWithdrawn / abandoned San Luis Obispo, CACAISO Apr 2020target 2023
Longspur 11
Solar + storage
234 MWWithdrawn / abandoned Kern, CACAISO Apr 2018target 2022
Cannae
Solar + storage
234 MWWithdrawn / abandoned Kern, CACAISO Apr 2021target 2030
Alba
Solar + storage
233 MWWithdrawn / abandoned Fresno, CACAISO Apr 2020target 2023
Helios Secondus
Solar
232 MWWithdrawn / abandoned Kern, CACAISO May 2016target 2020
Solitude Hybrid
Solar + storage
232 MWWithdrawn / abandoned Fresno, CACAISO Apr 2021target 2024
Blue Bird
Solar + storage
232 MWWithdrawn / abandoned Sutter, CACAISO Apr 2021target 2024
Willow Springs Solar Generating Station
Solar
231 MWWithdrawn / abandoned Kern, CACAISO Mar 2008target 2010
Suntower Gaskell Generating Station
Solar
231 MWWithdrawn / abandoned Kern, CACAISO Dec 2007target 2011
Trigo
Solar + storage
230 MWWithdrawn / abandoned Madera, CACAISO Apr 2019target 2023
Irrigosa
Solar + storage
230 MWWithdrawn / abandoned Madera, CACAISO Apr 2019target 2023
River Bluff Solar Energy Park
Solar
230 MWWithdrawn / abandoned San Bernardino, CACAISO Jul 2009target 2014
Hallows
Battery storage
230 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Sagebrush 6 Hybrid
Solar + storage
230 MWWithdrawn / abandoned Kern, CACAISO Apr 2019target 2022
Allium
Solar + storage
229 MWWithdrawn / abandoned San Benito, CACAISO Apr 2020target 2023
Shavers Valley Wind Farm
Onshore wind
228 MWWithdrawn / abandoned Riverside, CACAISO Jul 2007target 2010
Allegro Hybrid Solar
Solar + storage
227 MWWithdrawn / abandoned Kern, CACAISO Apr 2020target 2023
Mule Car
Battery storage
227 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Lacuna Energy Storage
Battery storage
227 MWWithdrawn / abandoned Alameda, CACAISO Apr 2021target 2024
Flyway Solar
Solar + storage
227 MWWithdrawn / abandoned Kern, CACAISO Apr 2021target 2024
Elbow
Gas
225 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Stoneman
Battery storage
225 MWWithdrawn / abandoned Contra Costa, CACAISO Apr 2021target 2024
Beauchamp 2 Solar
Solar + storage
225 MWWithdrawn / abandoned Colusa, CACAISO Apr 2019target 2023
Sagebrush Solar 5
Solar
224 MWWithdrawn / abandoned Kern, CACAISO Apr 2018target 2022
SP Blythe 1
Solar
221 MWWithdrawn / abandoned Riverside, CACAISO Mar 2011target 2018
Angeles Energy Storage
Battery storage
220 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Harbor II
Gas
220 MWWithdrawn / abandoned Los Angeles, CACAISO Jan 2007target 2012
Placer Solar PV I
Solar
220 MWWithdrawn / abandoned Placer, CACAISO Jul 2010target 2014
California Solar One
Solar
220 MWWithdrawn / abandoned San Bernardino, CACAISO Dec 2006target 2009
Hood 2
Solar
220 MWWithdrawn / abandoned Stanislaus, CACAISO Apr 2018target 2022
Johanna Energy Center (Fka Johanna Energy Center LMS)
Gas
220 MWWithdrawn / abandoned Orange, CACAISO Apr 2014target 2019
Hood 3
Solar
220 MWWithdrawn / abandoned Stanislaus, CACAISO Apr 2018target 2022
Madera Solar PV I (Fka Wheeler Ridge Solar PV1)
Solar
220 MWWithdrawn / abandoned Madera, CACAISO Feb 2010target 2013
Rangeland Solar
Solar + storage
217 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2021target 2033
Myrtle
Solar + storage
216 MWWithdrawn / abandoned Sonoma, CACAISO Apr 2021target 2025
Tumey Hills Solar
Battery storage
216 MWWithdrawn / abandoned CACAISO Apr 2023target 2030
Tumey Hills Energy Storage
Battery storage
216 MWWithdrawn / abandoned Fresno, CACAISO Apr 2023target 2030
Brooks
Solar + storage
215 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Cuesta
Solar + storage
215 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Minden
Solar + storage
215 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Winter Harvest
Solar + storage
215 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Zinc BESS
Battery storage
214 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Feather Energy Storage
Battery storage
214 MWWithdrawn / abandoned CACAISO Apr 2023
Salt Flat Energy Storage
Battery storage
214 MWWithdrawn / abandoned CACAISO Apr 2023target 2025
Sunridge Storage
Battery storage
214 MWWithdrawn / abandoned Sacramento, CACAISO Apr 2021target 2026
Goldenstar Energy Storage
Battery storage
214 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2021target 2024
Timber Energy Storage
Battery storage
214 MWWithdrawn / abandoned Placer, CACAISO Apr 2021target 2024
Page 18 of 44

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)