Hood 3

Hood 3 is a 220 MW solar request withdrawn in the CAISO interconnection queue, in Stanislaus County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2018 (completed)
  2. Withdrawn / abandonedApr 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1453
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Q1244 Switching Station 230kV
Location
Stanislaus County, California
Technology
Solar: 220 MW
Total requested
220 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
16 April 2018
Proposed online date
December 2022
Withdrawn
April 2019

Location

Marker shows the centre of Stanislaus County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Stanislaus County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem