United States › Grid › Interconnection queues › California

SOLAR + STORAGE · CAISO

Solitude Hybrid

Solitude Hybrid is a 232 MW solar + storage request withdrawn in the CAISO interconnection queue, in Fresno County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2021 (completed)
  2. Withdrawn / abandonedNov 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1957
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Panoche Substation 230 kV
Location
Fresno County, California
Technology
Solar: 116 MW · Battery: 116 MW
Total requested
232 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
15 April 2021
Proposed online date
June 2024
Withdrawn
November 2022

Location

Marker shows the centre of Fresno County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Fresno County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem