Allegro Hybrid Solar

Allegro Hybrid Solar is a 227 MW solar + storage request withdrawn in the CAISO interconnection queue, in Kern County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2020 (completed)
  2. Withdrawn / abandonedJul 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1777
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Highwind Substation 220kV
Location
Kern County, California
Technology
Solar: 152 MW · Battery: 75.0 MW
Total requested
227 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
15 April 2020
Proposed online date
November 2023
Withdrawn
July 2020

Location

Marker shows the centre of Kern County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Kern County