🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › California

ONSHORE WIND · CAISO

Shavers Valley Wind Farm

Shavers Valley Wind Farm is a 228 MW onshore wind request withdrawn in the CAISO interconnection queue, in Riverside County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2007 (completed)
  2. Withdrawn / abandonedNov 2008 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
245
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Devers-Mirage-Julian Hinds 230kV line
Location
Riverside County, California
Technology
Wind: 228 MW
Total requested
228 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
16 July 2007
Proposed online date
December 2010
Withdrawn
November 2008

Location

Marker shows the centre of Riverside County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Riverside County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem