OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in ISO-NE (New England) — page 17
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Scitico DG Cluster Solar + storage |
5.2 MW | Withdrawn / abandoned |
| Solar Solar |
5.2 MW | Withdrawn / abandoned |
| Eversource Group Study @ Wing Lane Solar |
5.1 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
5.1 MW | Withdrawn / abandoned |
| NG NEMA Group DER Study Solar + storage |
5.0 MW | Withdrawn / abandoned |
| Bowman Street 115 kV SS - Augusta Area Study Solar + storage |
5.0 MW | Withdrawn / abandoned |
| Leeds 115 kV SS - Sturtevant-Leeds-Livermore-Ludden-Riley Area DG Study Solar |
5.0 MW | Withdrawn / abandoned |
| Solar and Battery Solar + storage |
5.0 MW | Withdrawn / abandoned |
| EE CT DER Group Study Battery storage |
5.0 MW | Withdrawn / abandoned |
| Solar Solar |
5.0 MW | Withdrawn / abandoned |
| EE 2024 SEMA/Cape ASO Group Study Solar + storage |
5.0 MW | Withdrawn / abandoned |
| Solar + Battery Solar + storage |
5.0 MW | Withdrawn / abandoned |
| Solar and Battery Solar + storage |
5.0 MW | Withdrawn / abandoned |
| EE 2024 SEMA/Cape ASO Group Study Solar + storage |
5.0 MW | Withdrawn / abandoned |
| CMP Spring St 115 kV SS - Greater Portland Area DG Study Solar |
5.0 MW | Withdrawn / abandoned |
| Individual @ Montague Battery storage |
5.0 MW | Withdrawn / abandoned |
| Canton 470 - EMA ASO Solar + storage |
5.0 MW | Withdrawn / abandoned |
| EE CT DER Group Study Battery storage |
5.0 MW | Withdrawn / abandoned |
| Walpole 146 110A - 2023 EE GB ASO Solar + storage |
5.0 MW | Withdrawn / abandoned |
| Holliston 130 - EMA ASO Battery storage |
5.0 MW | Withdrawn / abandoned |
| RMLD DER Group Study Battery storage |
5.0 MW | Withdrawn / abandoned |
| Solar Increase Solar |
5.0 MW | Withdrawn / abandoned |
| NG NEMA Group DER Study Battery storage |
5.0 MW | Withdrawn / abandoned |
| Solar Solar |
5.0 MW | Withdrawn / abandoned |
| EE 2024 SEMA/Cape ASO Group Study Battery storage |
5.0 MW | Withdrawn / abandoned |
| EE CT DG Group Study Solar |
5.0 MW | Withdrawn / abandoned |
| EE 2024 SEMA/Cape ASO Group Study Solar + storage |
5.0 MW | Withdrawn / abandoned |
| Sturtevant 115 kV SS - Sturtevant-Leeds-Livermore-Ludden-Riley Area Study Solar |
5.0 MW | Withdrawn / abandoned |
| Drumrock - NG WRI DG Area Study #2 <5 MW Solar |
5.0 MW | Withdrawn / abandoned |
| Tremont 713 - EMA ASO Solar + storage |
5.0 MW | Withdrawn / abandoned |
| Solar Solar |
5.0 MW | Withdrawn / abandoned |
| Cumberland 22B - WMA ASO Solar + storage |
5.0 MW | Withdrawn / abandoned |
| Solar Solar |
5.0 MW | Withdrawn / abandoned |
| Royalston Substation - NG WMA Group 3 Solar + storage |
5.0 MW | Withdrawn / abandoned |
| EE 2024 SEMA/Cape ASO Group Study Solar + storage |
5.0 MW | Withdrawn / abandoned |
| EE 2024 SEMA/Cape ASO Group Study Battery storage |
5.0 MW | Withdrawn / abandoned |
| Wind Onshore wind |
5.0 MW | Withdrawn / abandoned |
| Hyannis 961 - EMA ASO Solar + storage |
5.0 MW | Withdrawn / abandoned |
| Solar and Battery Solar + storage |
5.0 MW | Withdrawn / abandoned |
| CMP Elm St 115 kV SS - Greater Portland Area DG Study Solar |
5.0 MW | Withdrawn / abandoned |
| Solar and Battery Solar + storage |
5.0 MW | Withdrawn / abandoned |
| Solar Solar |
5.0 MW | Withdrawn / abandoned |
| Ashburnham substation - NG Western MA Area Cluster Study Solar |
5.0 MW | Withdrawn / abandoned |
| Solar Solar |
5.0 MW | Withdrawn / abandoned |
| EE 2024 SEMA/Cape ASO Group Study Solar + storage |
5.0 MW | Withdrawn / abandoned |
| E. Westminster Substation - NG WMA Group 3 Solar + storage |
5.0 MW | Withdrawn / abandoned |
| Canton 470 110A - 2023 EE GB ASO Battery storage |
5.0 MW | Withdrawn / abandoned |
| Solar plus Battery Solar + storage |
5.0 MW | Withdrawn / abandoned |
| Uxbridge Substation – NG Hopedale West Group Study Battery storage |
5.0 MW | Withdrawn / abandoned |
| BESS Battery storage |
5.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)