United States βΊ Grid βΊ Interconnection queues βΊ Massachusetts
BATTERY STORAGE Β· ISO-NEBESS
BESS is a 5.0 MW battery storage request withdrawn in the ISO-NE interconnection queue, in Essex County, Massachusetts.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2025 (completed)
- Withdrawn / abandonedJun 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1601
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- NGRID KING ST T3
- Location
- Essex County, Massachusetts
- Technology
- Battery: 5.0 MW
- Total requested
- 5.0 MW
- Queue status
- Withdrawn
- Entered queue
- 14 January 2025
- Proposed online date
- February 2027
- Withdrawn
- June 2025
Location
Marker shows the centre of Essex County; the queue data does not give exact sites.
Power plants in Massachusetts Β· Transmission lines in Massachusetts
Other requests in Essex County
- Battery StorageBattery storage Β· 225 MW Β· in study
- Battery StorageBattery storage Β· 200 MW Β· in study
- Footprint Combined Cycle UnitGas Β· 716 MW Β· built
- Simple Cycle Gas TurbineGas Β· 61.9 MW Β· built
- Gas Turbine IncreaseGas Β· 10.9 MW Β· built
- Salem Harbor Station IncreaseOther Β· 8.0 MW Β· built
- Covanta Haverhill Landfill GasOther Β· 1.6 MW Β· built
- Simple CycleGas Β· 478 MW Β· withdrawn
- Battery StorageBattery storage Β· 315 MW Β· withdrawn
- Battery StorageBattery storage Β· 241 MW Β· withdrawn
- Battery StorageBattery storage Β· 150 MW Β· withdrawn
- Peabody PowerGas Β· 97.2 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem