United States β€Ί Grid β€Ί Interconnection queues β€Ί Connecticut

SOLAR Β· ISO-NE

Solar

Solar is a 5.0 MW solar request withdrawn in the ISO-NE interconnection queue, in Fairfield County, Connecticut.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2012 (completed)
  2. Withdrawn / abandonedMar 2012 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
389
Grid region
ISO-NE (New England)
Connection point (POI)
CL&P 115 kV Norwalk Harbor Substation
Location
Fairfield County, Connecticut
Technology
Solar: 5.0 MW
Total requested
5.0 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
17 January 2012
Proposed online date
May 2013
Withdrawn
March 2012

Location

No county location in the queue data.