United States › Grid › Interconnection queues › Connecticut

BATTERY STORAGE · ISO-NE

Battery Storage

Battery Storage is a 5.1 MW battery storage request withdrawn in the ISO-NE interconnection queue, in Middlesex County, Connecticut.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2023 (completed)
  2. Withdrawn / abandonedJun 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1348
Grid region
ISO-NE (New England)
Connection point (POI)
Eversource Portland 21H
Location
Middlesex County, Connecticut
Technology
Battery: 5.1 MW
Total requested
5.1 MW
Queue status
Withdrawn
Entered queue
26 January 2023
Proposed online date
July 2025
Withdrawn
June 2025

Location

No county location in the queue data.

Power plants in Connecticut · Transmission lines in Connecticut

Other requests in Middlesex County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem