πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Rhode Island

SOLAR Β· ISO-NE

Solar

Solar is a 5.2 MW solar request withdrawn in the ISO-NE interconnection queue, in Washington County, Rhode Island, connecting to NGRID.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2018 (completed)
  2. Withdrawn / abandonedJun 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
766
Grid region
ISO-NE (New England)
Utility / transmission owner
NGRID
Connection point (POI)
GRID 68F1 feeder (Richmond, RI)
Location
Washington County, Rhode Island
Technology
Solar: 5.2 MW
Total requested
5.2 MW
Queue status
Withdrawn
Entered queue
22 May 2018
Proposed online date
March 2025
Withdrawn
June 2025

Location

Marker shows the centre of Washington County; the queue data does not give exact sites.

Power plants in Rhode Island Β· Transmission lines in Rhode Island

Other requests in Washington County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem