United States β€Ί Grid β€Ί Interconnection queues β€Ί Connecticut

SOLAR Β· ISO-NE

Solar

Solar is a 5.0 MW solar request withdrawn in the ISO-NE interconnection queue, in Windham County, Connecticut.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2018 (completed)
  2. Withdrawn / abandonedFeb 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
804
Grid region
ISO-NE (New England)
Connection point (POI)
Eversource, 23kV, Line 14MX29, POI is ~3.6 miles from Tracy Substation, POI Lat/Long = 41.907528, -71.914968
Location
Windham County, Connecticut
Technology
Solar: 5.0 MW
Total requested
5.0 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
10 December 2018
Proposed online date
July 2020
Withdrawn
February 2019

Location

No county location in the queue data.

Power plants in Connecticut Β· Transmission lines in Connecticut

Other requests in Windham County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem