United States › Grid › Interconnection queues › Massachusetts
SOLAR + STORAGE · ISO-NEWalpole 146 110A - 2023 EE GB ASO
Walpole 146 110A - 2023 EE GB ASO is a 5.0 MW solar + storage request withdrawn in the ISO-NE interconnection queue, in Norfolk County, Massachusetts.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2024 (completed)
- Withdrawn / abandonedJun 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1494
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- Eversource Walpole 146 110A
- Location
- Norfolk County, Massachusetts
- Technology
- Solar: 5.0 MW · Battery
- Total requested
- 5.0 MW
- Queue status
- Withdrawn
- Entered queue
- 26 January 2024
- Proposed online date
- December 2026
- Withdrawn
- June 2025
Location
Marker shows the centre of Norfolk County; the queue data does not give exact sites.
Power plants in Massachusetts · Transmission lines in Massachusetts
Other requests in Norfolk County
- Medway Grid Battery StorageBattery storage · 250 MW · agreement signed
- Energy StorageBattery storage · 170 MW · agreement signed
- NEA Bell. Uprate (Northeast Energy Associates, LP)Gas · 1.4 MW · agreement signed
- Battery StorageBattery storage · 300 MW · in study
- Medway Peaker - SEMARIGas · 208 MW · built
- Thomas A. Watson Generating StationGas · 108 MW · built
- Kearsarge Solar with batterySolar + storage · 5.4 MW · built
- Battery Storage Increase (QP1238)Battery storage · 301 MW · withdrawn
- Battery StorageBattery storage · 270 MW · withdrawn
- Battery StorageBattery storage · 254 MW · withdrawn
- Battery StorageBattery storage · 250 MW · withdrawn
- Gas TurbineGas · 208 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem