United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in ERCOT (Texas) — page 17
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Sullivan Solar Solar + storage · Sullivan Solar LLC |
171 MW | In study |
| Seven Springs Storage Solar + storage · Hancock Reservoir, LLC |
171 MW | In study |
| Juniperus BESS Solar + storage · BLUE STONE RENEWABLE XXI LLC |
170 MW | In study |
| Donna Solar Solar + storage · Donna Solar LLC |
168 MW | In study |
| Carol Battery Battery storage |
168 MW | Paused / redesign |
| Jalisco Cogen Gas · HEP Power Generation, LLC |
168 MW | In study |
| Bell Song Solar 2 Solar · Bell Song Solar, LLC 2 |
168 MW | In study |
| Bell Song Solar 3 Solar · Bell Song Solar, LLC_3 |
168 MW | In study |
| Bell Song Solar Solar · Bell Song Solar, LLC |
168 MW | In study |
| Lone Star Industrial Park Gas Power Project Gas · LONE STAR INDUSTRIAL PARK, LLC |
166 MW | In study |
| CAROL wind Onshore wind |
165 MW | Paused / redesign |
| Hart Wind (Old POI) Onshore wind |
165 MW | Paused / redesign |
| Zeppelin Energy Storage Battery storage · ZEPPELIN ENERGY STORAGE LLC |
164 MW | In study |
| Dove Creek Solar Solar + storage · Dove Creek Solar, LLC |
164 MW | In study |
| BRP Pollux BESS Battery storage · BRP Pollux BESS LLC |
163 MW | In study |
| Dove Creek Storage Solar + storage · Dove Creek Solar, LLC |
163 MW | In study |
| Creekfield Solar Solar |
161 MW | Paused / redesign |
| Aster Solar Solar · Aster Solar |
161 MW | In study |
| Weathervane Solar SLF Solar |
161 MW | Paused / redesign |
| Solgen Solar Solar + storage · Lampasas Hybrid Energy |
160 MW | In study |
| Albatross BESS 2 Battery storage · Albatross Solar, LLC |
160 MW | In study |
| Stargazer Solar Solar + storage · Stargazer Solar LLC |
158 MW | In study |
| High Plains Storage Battery storage · ROBP Holdings, LLC |
158 MW | In study |
| Otter BESS Battery storage · GRS BESS TEXAS TEN, LLC |
157 MW | In study |
| Pecan BESS Battery storage · Gransolar Texas Three LLC |
157 MW | In study |
| Cartwheel BESS 2 Battery storage · RWE Renewables |
157 MW | In study |
| Strawberry Acres Storage Battery storage · Strawberry Acres Energy Center, LLC |
157 MW | In study |
| Coyote Den Storage Battery storage · Coyote Den Energy Center, LLC |
157 MW | In study |
| Firefly Fields Storage Solar + storage · Firefly Fields Energy Center LLC |
157 MW | In study |
| Chimney Rock BESS Battery storage · Taylor ESS, LLC |
156 MW | In study |
| Short Creek BESS Solar + storage · Wichita Solar I, LLC |
156 MW | In study |
| Antonio Road BESS Battery storage · Tempus Power management LLC |
156 MW | In study |
| Salt-Lick Storage Solar + storage · Salt-Lick Storage, LLC |
155 MW | In study |
| Ranger BESS Battery storage · Nova Clean Energy LLC |
155 MW | In study |
| Winters Glow Storage Solar + storage · Winters Glow Storage, LLC |
155 MW | In study |
| Dorsey Road BESS Battery storage · Horizon Energy Storage Greenfield Project Holdings LLC |
155 MW | In study |
| Berryman Road Storage Battery storage · Horizon Energy Storage Greenfield Project Holdings LLC |
155 MW | In study |
| Galaxy Storage Solar + storage · Galaxy Solar, LLC |
155 MW | In study |
| SunWave Solar Solar · Buckeye Nueces Bay Solar LLC |
154 MW | In study |
| Bastion BESS Battery storage · BESS BASTION LLC |
154 MW | In study |
| Valcrest BESS Battery storage · Flexen USA LLC |
154 MW | In study |
| Roble BESS Battery storage · Flexen USA LLC |
154 MW | In study |
| Pavo Creek Storage Battery storage · Pavo Creek Storage, LLC |
154 MW | In study |
| Quarter Ranch Solar Solar · Gransolar Texas Three LLC |
154 MW | In study |
| Badger BESS Solar + storage · Greasewood BESS, LLC |
154 MW | In study |
| Maderagemela BESS1 Battery storage · Twinwood ES1, LLC |
154 MW | In study |
| Pamplona Storage Solar + storage · Karol Solar V |
154 MW | In study |
| Blanco County Behrends Storage Battery storage · DM-BCB, LLC |
154 MW | In study |
| Bonaparte BESS Battery storage · Bonaparte BESS, LLC |
154 MW | In study |
| Leon BESS Solar + storage · Leon BESS |
154 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,496 · 455.6 GW
- ERCOT (Texas)1,408 · 328.0 GW
- MISO (Midcontinent)1,337 · 302.2 GW
- Southeast (non-ISO utilities)815 · 118.5 GW
- SPP (Southwest Power Pool)480 · 114.8 GW
- PJM (Mid-Atlantic, Midwest)905 · 105.4 GW
- CAISO (California)194 · 92.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)27 · 6,015 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)