Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Barrosos Creek Wind 3 Onshore wind · Cascabel Wind Energy, LLC |
198 MW | In study |
| Barrosos Creek Wind 4 Onshore wind · Cascabel Wind Energy, LLC |
198 MW | In study |
| Wood Fern Wind Onshore wind · Wood Fern Wind LLC |
197 MW | In study |
| Corralitos Wind 3 Onshore wind · Las Crestas Wind Energy, LLC |
196 MW | In study |
| Johnson Grass Solar Solar · Johnson Grass Solar ,LLC |
196 MW | In study |
| Corralitos Wind 4 Onshore wind · Las Crestas Wind Energy, LLC |
195 MW | In study |
| Paloma Energy Center Solar + storage · Harrison Street Development, LLC |
194 MW | In study |
| Steelhead Energy Storage Battery storage · GRS BESS TEXAS SEVEN, LLC |
192 MW | In study |
| Malachite BESS Solar + storage · Malachite Storage LLC |
191 MW | In study |
| Pecos Wind Wind + storage · Midnight Energy Center, LLC |
191 MW | In study |
| Accalia Point Solar Solar · Accalia Point Solar LLC |
191 MW | In study |
| Harryoung Solar Solar + storage · Gransolar Texas Four LLC |
190 MW | In study |
| HarryoungBESS Solar + storage · Gransolar Texas Four LLC |
190 MW | In study |
| Chacon Creek Battery storage · Cattlemen BESS LLC |
189 MW | In study |
| Blanket Ranch North Solar Solar + storage · Blanket Ranch North Solar, LLC |
189 MW | In study |
| Serrano Storage Battery storage · Maverick ESS, LLC |
186 MW | In study |
| Wetzel BESS Battery storage · Brown ESS, LLC |
186 MW | In study |
| Montezuma Storage Battery storage · Montezuma Storage LLC |
185 MW | In study |
| Los Vientos IB Repower Onshore wind · Los Vientos Windpower IB, LLC |
185 MW | In study |
| Malachite Solar Solar + storage · Malachite Solar LLC |
185 MW | In study |
| Maldives Solar (Oncor POI) Solar |
184 MW | Paused / redesign |
| Cairos Storage 2 Battery storage · Cairos Solar, LLC |
184 MW | In study |
| Jalisco Peaker Gas · HEP Power Generation, LLC |
184 MW | In study |
| Basketflower Solar Solar + storage · Basketflower Solar, LLC |
183 MW | In study |
| Lan Solar SLF Solar + storage · BR Solar, LLC |
182 MW | In study |
| Caesar Solar Solar + storage · Caesar Solar, LLC |
182 MW | In study |
| Nanulak BESS Battery storage · Nanulak BESS, L.L.C. |
182 MW | In study |
| Oak Belt Solar Solar + storage · Oak Belt Solar, LLC |
181 MW | In study |
| Turkey Creek Solar SLF Solar + storage · Greenray Solar Corporation |
181 MW | In study |
| Frizzle BESS Battery storage · Frizzle BESS, L.L.C. |
181 MW | In study |
| Hofbrau BESS Battery storage · Momentum Hofbrau LLC |
181 MW | In study |
| Amphion Solar Phase 1 Solar · Amphion Solar, LLC |
181 MW | In study |
| Alliance Solar Solar |
180 MW | Paused / redesign |
| Amberjack2 BESS Battery storage · Hunt Energy Network, LLC |
180 MW | In study |
| Indigo solar 2 Solar + storage · Indigo Solar 2 |
180 MW | In study |
| Whitetail BESS Battery storage · Hunt Energy Network, LLC |
180 MW | In study |
| Bestla Solar Solar |
180 MW | Paused / redesign |
| Proteus Thornton Ranch Solar SLF Solar + storage · Thornton Ranch Solar, LLC |
180 MW | In study |
| Scarlet Solar Solar · Innovative Solar 416, LLC |
180 MW | In study |
| Green Ocelot Storage Solar + storage · Ocelot Solar LLC |
179 MW | In study |
| Tri-County Solar Solar |
178 MW | Paused / redesign |
| Saddle Horn Station BESS SLF Solar + storage · Saddle Horn Station BESS LLC |
177 MW | In study |
| McMurtre Storage Battery storage · BT McMurtre Storage, LLC |
176 MW | In study |
| Yooperlite Storage Battery storage · BT Yooperlite Storage, LLC |
176 MW | In study |
| Eligius BESS Battery storage · Eligius Storage LLC |
175 MW | In study |
| Saddle Horn Station Solar SLF Solar + storage · Saddle Horn Station LLC |
175 MW | In study |
| Coastal Bayou Storage Battery storage · TOCE TX BESS 5, LLC |
175 MW | In study |
| Pethrus BESS Battery storage · Pethrus BESS, LLC |
174 MW | In study |
| Wagon Timber Solar Solar + storage · Wagon Timber Solar, LLC |
172 MW | In study |
| Cascade Solar Solar |
171 MW | Paused / redesign |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,496 · 455.6 GW
- ERCOT (Texas)1,408 · 328.0 GW
- MISO (Midcontinent)1,337 · 302.2 GW
- Southeast (non-ISO utilities)815 · 118.5 GW
- SPP (Southwest Power Pool)480 · 114.8 GW
- PJM (Mid-Atlantic, Midwest)905 · 105.4 GW
- CAISO (California)194 · 92.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)27 · 6,015 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)