Queue requests in study in the USA — page 123

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown6,8521,550.1 GW
Active in queue2,001.0 GW9,187 requests
Agreement signed423.2 GW2,141 requests
Withdrawn24,2054,519.8 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

6,852 requests · page 123 of 138
ProjectCapacityStatusLocationRegionQueuedOnline
Other project 11-042, Jefferson County
Other
37.0 MWPaused / redesign Jefferson, ORWest Jun 2011target 2013
Replacing 37 MW of natural gas generation with BESS at Joppa; Joppa
Other
37.0 MWIn study MISO Dec 2022target 2024
Solar + storage project AH2-268, Dinwiddie County
Solar + storage
37.0 MWIn study Dinwiddie, VAPJM Mar 2022target 2025
Solar + storage project GEN-2024-044, Caddo Parish County
Solar + storage
36.0 MWIn study Caddo Parish, LASPP Oct 2024target 2027
Solar project AH2-129, Armstrong County
Solar
36.0 MWIn study Armstrong, PAPJM Mar 2022target 2026
Riverhead Solar 2
Solar · Riverhead Solar 2, LLC
36.0 MWIn study Suffolk, NYNYISO Feb 2016target 2027
Solar project AI2-144, St. Joseph County
Solar
36.0 MWIn study St. Joseph, MIPJM Feb 2023target 2025
Gas project 377, Silver Bow County
Gas
36.0 MWPaused / redesign Silver Bow, MTWest May 2020target 2022
Solar project AH2-081, Fayette County
Solar
35.5 MWIn study Fayette, OHPJM Jan 2022target 2025
Solar + storage project AH2-404, Pittsylvania County
Solar + storage
35.0 MWIn study Pittsylvania, VAPJM Mar 2022target 2026
Gas project 957700, Richmond County
Gas · Duke Energy Progress LLC
35.0 MWIn study Richmond, NCSoutheast Jun 2024
Gas project 25-IC-1286, Effingham County
Gas
35.0 MWIn study Effingham, GASoutheast Mar 2025target 2028
Solar project J3188, Marshall County
Solar
35.0 MWIn study Marshall, ILMISO Sep 2022target 2023
Cottontail Solar 7
Solar
35.0 MWPaused / redesign Columbia, PAPJM Sep 2019target 2028
Solar + storage project AH2-151, Halifax County
Solar + storage
35.0 MWIn study Halifax, VAPJM Feb 2022target 2025
Solar project J2982, Warren County
Solar
35.0 MWIn study Warren, ILMISO Sep 2022target 2023
Solar + storage project GI-2022-158, Imperial County
Solar + storage
35.0 MWIn study Imperial, CAWest Sep 2022target 2024
Solar project AG2-298, Marion County
Solar · Crab Run Solar Project, LLC
35.0 MWIn study Marion, KYPJM Mar 2025target 2024
Gas project PP00014, Richmond County
Gas
35.0 MWIn study Richmond, NCSoutheast Apr 2025target 2026
Gas project 25-IC-1285, Effingham County
Gas
35.0 MWIn study Effingham, GASoutheast Mar 2025target 2028
Solar + storage project AI1-159, Montgomery County
Solar + storage
35.0 MWIn study Montgomery, KYPJM Sep 2022target 2028
Solar project AI2-335, Martin County
Solar
34.9 MWIn study Martin, KYPJM Mar 2023target 2026
Solar project AI2-334, Martin County
Solar
34.9 MWIn study Martin, KYPJM Mar 2023target 2026
Solar project AI2-474, Montour County
Solar
34.8 MWIn study Montour, PAPJM Mar 2023target 2026
Gas project GI-2025-179, Imperial County
Gas
34.8 MWIn study Imperial, CAWest Feb 2025target 2027
Solar project AI2-336, Harrison County
Solar
34.6 MWIn study Harrison, OHPJM Mar 2023target 2026
Blanket Ranch South Storage
Solar + storage · Blanket Ranch South Solar, LLC
34.3 MWIn study Brown, TXERCOT Jun 2022target 2028
Solar + storage project AG2-426, Sussex County
Solar + storage · Waverly Solar 1, LLC
33.5 MWIn study Sussex, VAPJM Feb 2025target 2024
Solar project AH2-082, Fayette County
Solar
33.3 MWIn study Fayette, OHPJM Jan 2022target 2025
Gas project 957510, Rockingham County
Gas
33.0 MWIn study Rockingham, NCSoutheast Jun 2024
Battery storage project AJ1-038, York County
Battery storage
33.0 MWIn study York, VAPJM Jun 2023target 2025
Gas project 957509, Rockingham County
Gas
33.0 MWIn study Rockingham, NCSoutheast Jun 2024
Coal project GI-48, Randolph County
Coal
33.0 MWIn study Randolph, MOSoutheast Oct 2012target 2012
Solar project GEN-2022-004, Sedgwick County
Solar
33.0 MWIn study Sedgwick, KSSPP May 2022target 2028
Nuclear project 957243, Mecklenburg County
Nuclear
33.0 MWIn study Mecklenburg, NCSoutheast Jun 2024
Onshore wind project J2122, Franklin County
Onshore wind
33.0 MWIn study Franklin, IAMISO Aug 2021target 2024
Sweetleaf Solar
Solar
33.0 MWPaused / redesign Halifax, NCPJM Aug 2017target 2027
Meadow Forge Solar Energy Center
Solar
33.0 MWPaused / redesign Delaware, INPJM Mar 2019target 2026
Ty Cooke
Gas
33.0 MWPaused / redesign Lubbock, TXERCOT Aug 2020target 2021
Surplus; J1304
Other
33.0 MWIn study Rock, WIMISO Aug 2022target 2023
Hecate Solar
Solar · Hecate Energy
33.0 MWPaused / redesign Brewster, TXERCOT Mar 2015target 2020
Gas project 957511, Rockingham County
Gas
33.0 MWIn study Rockingham, NCSoutheast Jun 2024
Gas project 957447, Rockingham County
Gas
33.0 MWIn study Rockingham, NCSoutheast Jun 2024
Geothermal project GI-2023-177, Imperial County
Geothermal
33.0 MWIn study Imperial, CAWest Apr 2023target 2026
Gas project 957437, Rockingham County
Gas
33.0 MWIn study Rockingham, NCSoutheast Jun 2024
Weathervane Storage SLF
Battery storage
32.5 MWPaused / redesign Montague, TXERCOT Aug 2023
Solar + storage project AH2-093, Greene County
Solar + storage
32.0 MWIn study Greene, OHPJM Jan 2022target 2025
Hydro project 648, Grainger County
Hydro
32.0 MWIn study Grainger, TNSoutheast Sep 2024target 2028
Solar project AI2-153, Louisa County
Solar
32.0 MWIn study Louisa, VAPJM Mar 2023target 2022
Meridian BESS
Battery storage · Navitas Energy- Meredian BESS
31.2 MWIn study Bosque, TXERCOT Mar 2023target 2027
Page 123 of 138

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)