United States › Grid › Interconnection queues › Wisconsin
OTHER · MISOSurplus; J1304
Surplus; J1304 is a 33.0 MW other request in interconnection study in the MISO interconnection queue, in Rock County, Wisconsin, connecting to AMERICAN TRANSMISSION COMPANY.
Queue statusIn planning
- PlanningQueued Aug 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jul 2023 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- S1035
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- AMERICAN TRANSMISSION COMPANY
- Connection point (POI)
- Townline Rd. - Paddock 138kV
- Location
- Rock County, Wisconsin
- Technology
- Other: 33.0 MW · Battery
- Total requested
- 33.0 MW
- Queue status
- Active
- Entered queue
- 15 August 2022
- Proposed online date
- July 2023
Location
Marker shows the centre of Rock County; the queue data does not give exact sites.
Other requests in Rock County
- Solar project J1460, Rock CountySolar · 200 MW · under construction
- Solar project J1377, Rock CountySolar · 98.6 MW · agreement signed
- Gas project J2947, Rock CountyGas · 205 MW · in study
- Battery storage project J3162, Rock CountyBattery storage · 100 MW · in study
- Gas project J3156, Rock CountyGas · 100 MW · in study
- Solar project J4097, Rock CountySolar · 71.5 MW · in study
- Surplus; J1188Other · 25.0 MW · in study
- Gas project J390, Rock CountyGas · 711 MW · built
- Gas project G035, Rock CountyGas · 505 MW · built
- Solar project J850, Rock CountySolar · 250 MW · built
- Gas project G072, Rock CountyGas · 150 MW · built
- Solar project J1304, Rock CountySolar · 65.0 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem