United States › Grid › Interconnection queues › Wisconsin
GAS · MISOGas project G035, Rock County
Gas project G035, Rock County is a 505 MW gas request built and operating in the MISO interconnection queue, in Rock County, Wisconsin.
Request details
- Queue ID
- G035
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Rock River 138kV Substation
- Location
- Rock County, Wisconsin
- Technology
- Gas: 505 MW
- Total requested
- 505 MW
- Study phase
- Network Upgrade
- Queue status
- Operational
- Entered queue
- 25 April 2000
- Proposed online date
- June 2003
- Came online
- June 2003
Location
Marker shows the centre of Rock County; the queue data does not give exact sites.
Other requests in Rock County
- Solar project J1460, Rock CountySolar · 200 MW · under construction
- Solar project J1377, Rock CountySolar · 98.6 MW · agreement signed
- Gas project J2947, Rock CountyGas · 205 MW · in study
- Battery storage project J3162, Rock CountyBattery storage · 100 MW · in study
- Gas project J3156, Rock CountyGas · 100 MW · in study
- Solar project J4097, Rock CountySolar · 71.5 MW · in study
- Surplus; J1304Other · 33.0 MW · in study
- Surplus; J1188Other · 25.0 MW · in study
- Gas project J390, Rock CountyGas · 711 MW · built
- Solar project J850, Rock CountySolar · 250 MW · built
- Gas project G072, Rock CountyGas · 150 MW · built
- Solar project J1304, Rock CountySolar · 65.0 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem